Sioux — Power plant · Coal · Union Electric Co - (MO)THOMPSON REUTERS DATA CEN — Large load · MO · 17.7 km awayOPPIDAN DATA CENTER — Large load · MO · 20.9 km awayHibiscus Solar, LLC — Solar · IL · 5 MW · 21.3 km awaySV CSG Roxana 1 — Solar · IL · 2.5 MW · 23.6 km awaySV CSG South Roxana — Solar · IL · 5 MW · 23.7 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 41% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1967
Net generation, 2025
3,986,364 MWh
Grid
138 kV to Union Electric Co - (MO) (MISO)
Location
St Charles County, Missouri

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
59 years since 1967
Heat rate
10,176 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Union Electric Co
Share pct
100
Gem entity id
E100000004265
Unit ids
G100000109448, G100000109449
Location id
L100000104028
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110064610292
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007202
Fuel burned (MMBtu), 202540,567,081
Capacity factor, 20250.414
Heat rate (Btu/kWh), 202510,176.5
Net generation (MWh), 20253,986,364.0
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2028
Capacity scheduled to retire
1,099.4 MW
Generators scheduled to retire
2
Share of in-service capacity scheduled
100%
Capacity still in service
1,099.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal549.7 MWScheduled to retireDecember 2028
2Conventional Steam Coal549.7 MWScheduled to retireDecember 2028

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Union Electric Co - (MO)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Union Electric Co - (MO) Operator EIA-860M
AMEREN CORP Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2 scheduled to retire, 1,099.4 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
THOMPSON REUTERS DATA CEN Built Large load 17.7 km
OPPIDAN DATA CENTER Under construction Large load 20.9 km
Hibiscus Solar, LLC Under construction Solar 21.3 km 5
SV CSG Roxana 1 Under construction Solar 23.6 km 2.5
SV CSG South Roxana Filed Solar 23.7 km 5