- Combustion
- Operating
- Retired
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
- Retired
- Other companies nearby
13 assets
13 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ameren Corp
Power plant owner
As filed: AMEREN CORP
Key facts
Power plant owner · 9,919.2 MW- Capacity held
- 9,919.2MW
- Assets
- 13
- States
- IL, MO
- Headquarters
- St. Louis, United States Source: Wikidata
- Website
- ameren.com Source: Wikidata
- Listed
- NYSE: AEE Source: SEC EDGAR
- LEI
- XRZQ5S7HYJFPHJ78L959 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why
Gross output of plants with a stake
13 of 13 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 13 of 13 plants with a stake: US plants with an EIA monthly series.100% of the output is from 13 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
- Coal
Yearly totals
| Year | Gas | Coal | Total (MWh) |
|---|---|---|---|
| 2026 (part year) | — | 12,354,798 | 12,354,798 |
| 2025 | 642,793 | 20,715,336 | 21,358,129 |
| 2024 | 371,270 | 18,249,474 | 18,620,744 |
| 2023 | 397,588 | 19,600,321 | 19,997,909 |
| 2022 | 433,575 | 25,269,027 | 25,702,602 |
| 2021 | 372,290 | 29,243,781 | 29,616,071 |
| 2020 | 216,589 | 26,009,776 | 26,226,365 |
| 2019 | 195,663 | 24,048,906 | 24,244,569 |
| 2018 | 428,479 | 30,542,902 | 30,971,381 |
| 2017 | 286,210 | 30,869,197 | 31,155,407 |
| 2016 | 312,004 | 27,411,342 | 27,723,346 |
| 2015 | 147,097 | 30,127,489 | 30,274,586 |
| 2014 | 109,188 | 33,060,046 | 33,169,234 |
| 2013 | 147,861 | 33,331,340 | 33,479,201 |
| 2012 | 526,825 | 32,423,157 | 32,949,982 |
| 2011 | 583,173 | 39,142,956 | 39,726,129 |
| 2010 | 575,975 | 38,244,039 | 38,820,014 |
| 2009 | 231,070 | 37,442,277 | 37,673,347 |
| 2008 | 380,782 | 40,091,476 | 40,472,258 |
| 2007 | 887,273 | 41,103,115 | 41,990,388 |
| 2006 | 403,892 | 41,379,228 | 41,783,120 |
| 2005 | 620,520 | 41,942,392 | 42,562,912 |
| 2004 | 66,987 | 39,374,229 | 39,441,216 |
| 2003 | 133,147 | 37,177,713 | 37,310,860 |
| 2002 | 341,642 | 34,438,910 | 34,780,553 |
| 2001 | 204,978 | 33,288,724 | 33,493,702 |
Assets 13
Assets
13
Capacity
9,919 MW
- Coal: 6,489 MW, 6 assets
- Gas, combustion turbine: 3,430 MW, 7 assets
Owns 13 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Labadie | Coal | Owns | 2,389.4 MW | US-MO | 100.0% | AMEREN CORP |
| Rush Island | Coal | Owns | 1,242 MW | US-MO | 100.0% | AMEREN CORP |
| Sioux | Coal | Owns | 1,099.4 MW | US-MO | 100.0% | AMEREN CORP |
| Meramec | Coal | Owns | 1,041 MW | US-MO | 100.0% | AMEREN CORP |
| Audrain Generating Station | Gas, combustion turbine | Owns | 814.4 MW | US-MO | 100.0% | AMEREN CORP |
| Goose Creek Energy Center | Gas, combustion turbine | Owns | 684 MW | US-IL | 100.0% | AMEREN CORP |
| Venice | Gas, combustion turbine | Owns | 586 MW | US-IL | 100.0% | AMEREN CORP |
| Meredosia | Coal | Owns | 564 MW | US-IL | 100.0% | AMEREN CORP |
| Raccoon Creek Energy Center | Gas, combustion turbine | Owns | 456 MW | US-IL | 100.0% | AMEREN CORP |
| Pinckneyville | Gas, combustion turbine | Owns | 380 MW | US-IL | 100.0% | AMEREN CORP |
| Kinmundy | Gas, combustion turbine | Owns | 270 MW | US-IL | 100.0% | AMEREN CORP |
| Peno Creek | Gas, combustion turbine | Owns | 240 MW | US-MO | 100.0% | AMEREN CORP |
| Hutsonville | Coal | Owns | 153 MW | US-IL | 100.0% | AMEREN CORP |
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 4
Registers
4
Reuse terms
- 3 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 22
within 15 miProjects
22
within 15 mi
Nearest
0.0 mi
Castle Bluff Energy Center
All 22NearbyShowing all 22 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Announced | Castle Bluff Energy Center | Gas, combustion turbine | 648 MW | 0.0 mi away | nearest: Meramec |
| Announced | Flora Solar | Solar | 125 MW | 3.8 mi away | nearest: Raccoon Creek Energy Center |
| Under construction | Two Blues Solar, LLC | Solar | 40 MW | 3.8 mi away | nearest: Pinckneyville |
| Under construction | Blue Jay Road Solar, LLC | Solar | 66 MW | 5.0 mi away | nearest: Audrain Generating Station |
| Under construction | SV CSG East St Louis | Solar | 5 MW | 7.0 mi away | nearest: Venice |
| Under construction | CF IL Solar Marigold Lane, Flora2 LLC | Solar | 2 MW | 7.2 mi away | nearest: Raccoon Creek Energy Center |
| Announced | Sycamore Riverside Energy, LLC | Gas, combustion turbine | 964 MW | 8.2 mi away | nearest: Hutsonville |
| Under construction | OPPIDAN DATA CENTER | Large load | — | 9.2 mi away | nearest: Venice |
| Permitted | Madden Creek Solar | Solar | 5 MW | 9.6 mi away | nearest: Goose Creek Energy Center |
| Built | THOMPSON REUTERS DATA CEN | Large load | — | 11.0 mi away | nearest: Sioux |
| Under construction | Snapdragon Solar, LLC | Solar | 28 MW | 11.9 mi away | nearest: Pinckneyville |
| Under construction | Great Plains Solar, LLC | Solar | 100 MW | 12.1 mi away | nearest: Pinckneyville |
| Filed | SV CSG South Roxana | Solar | 5 MW | 12.2 mi away | nearest: Venice |
| Filed | SV CSG Mahomet | Solar | 3.5 MW | 13.1 mi away | nearest: Goose Creek Energy Center |
| Under construction | Hibiscus Solar, LLC | Solar | 5 MW | 13.2 mi away | nearest: Sioux |
| Built | CENTENE DATA CENTER | Large load | — | 13.6 mi away | nearest: Labadie |
| Under construction | Argenta Solar | Solar | 1.5 MW | 13.8 mi away | nearest: Goose Creek Energy Center |
| Filed | Sandoval 2 | Solar | 2 MW | 13.9 mi away | nearest: Kinmundy |
| Under construction | SV CSG Roxana 1 | Solar | 2.5 MW | 14.1 mi away | nearest: Venice |
| Under construction | Ruby Solar, LLC | Solar | 50 MW | 14.3 mi away | nearest: Kinmundy |
| Under construction | SV CSG Brownstown 1 | Solar | 1 MW | 14.5 mi away | nearest: Kinmundy |
| Under construction | Clinton Solar 5 | Solar | 2.6 MW | 14.8 mi away | nearest: Kinmundy |
Sources EIA-860M · EPA ICIS-NPDES