Power plant · Coal

Key facts

Power plant · Coalran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1998
Net generation, 2025
8,978 MWh
Grid
34 kV to Ameren Illinois Company (MISO)
Location
Jackson County, Illinois
Operated by
Southern Illinois University CarbondaleSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2011 to 2026
Fuel burned MMBtu by year, 2011 to 2026
  • Coal

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
28 years since 1998
Unused energy
36 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Ameren Illinois Company
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Eia status
By code
OP
Mw
3.50
Units
1
SB
Mw
1.60
Units
1
Standby mw
1.60
Status rule
some_units_idle
In service mw
5.10
Out of service mw
0
Fuel burned (MMBtu), 2025910,932
Capacity factor, 20250.201
Net generation (MWh), 20258,978
Balancing authority codeMISO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 101462.7 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
SV CSG Corbell Under construction Solar 14.8 km 2
Murphysboro 1 Permitted Solar 15.1 km 5
Murphysboro 2 Permitted Solar 15.1 km 1.3
Big Muddy Solar Under construction Solar 18.1 km 95

Sources EIA-860M