Slocum
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1968
- Net generation, 2022
- -239 MWh
- Grid
- 24 kV to DTE Electric Company (MISO)
- Location
- Wayne County, Michigan
- Operated by
- DTE Electric CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 58 years since 1968
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- November 2023
- Capacity retired
- 13.5 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 2.7 MW | Retired | November 2023 |
| 2 | Petroleum Liquids | 2.7 MW | Retired | November 2023 |
| 3 | Petroleum Liquids | 2.7 MW | Retired | November 2023 |
| 4 | Petroleum Liquids | 2.7 MW | Retired | November 2023 |
| 5 | Petroleum Liquids | 2.7 MW | Retired | November 2023 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 24 kV
- Transmission or distribution system owner
- DTE Electric Company
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
Transmission lines within 25 km (10)
- Trenton Channel - Detroit Edison King Road 120 kV
- Detroit Edison King Road 120 kV line
- Detroit Edison King Road 120 kV line
- Detroit Edison King Road 120 kV line
- Detroit Edison King Road 120 kV line
- Brownstown 345 kV line
- Monroe Mi - Brownstown 345 kV
- Monroe Mi - Brownstown 345 kV
- Brownstown 345 kV line
- Brownstown 230 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 3, 4, 5 scheduled to retire, 13.5 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Trenton Channel Energy Center Under construction | Storage | 0.2 km | 220 |
| Project Cannoli Data Center Filed | Large load | 23.6 km |
Sources EIA-860M · Berkeley Lab · FAA OE/AAA
Sources
- EIA-860M
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.