Show on map
- Combustion
- Storage
- In development
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- In development
- Operating
South Tampa Resilience Project: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
South Tampa Resilience Project
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Grid
- 69 kV to Tampa Electric Co (TEC)
- Location
- Hillsborough County, Florida
- Operated by
- Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 1 year since 2025
- Unused energy
- 636 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 8,861 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 200,347 |
| Capacity factor, 2025 | 0.034 |
| Heat rate (Btu/kWh), 2025 | 8,861.4 |
| Net generation (MWh), 2025 | 22,609 |
| Balancing authority code | TEC |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| South Tampa Energy Storage Postponed | Storage | 0.2 mi | 20 |
| H L Culbreath Bayside Power Station Postponed | Gas, combustion turbine | 6.5 mi | 503.8 |
| Tampa Electric Co NA 2 Postponed | Gas, combustion turbine | 6.5 mi | 982 |
| Big Bend III Battery Storage Permitted | Storage | 8.4 mi | 75 |
| Tampa Electric Co NA 3 Postponed | Gas, combustion turbine | 8.6 mi | 99 |
Sources EIA-860M