Show on map
South Tampa Resilience Project — Power plant · Gas, reciprocating engine · Tampa Electric CoSouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 0.2 mi awayH L Culbreath Bayside Power Station — Postponed · Gas, combustion turbine · FL · 503.8 MW · 6.5 mi awayTampa Electric Co NA 2 — Postponed · Gas, combustion turbine · FL · 982 MW · 6.5 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 8.4 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 8.6 mi away
  • Combustion
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

South Tampa Resilience Project

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
69 kV to Tampa Electric Co (TEC)
Location
Hillsborough County, Florida
Operated by
Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025
Fuel burned MMBtu by year, 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
1 year since 2025
Unused energy
636 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
8,861 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Emera Inc
Share pct
100
Gem entity id
E100000000111
Unit ids
G100001028150, G100001028152
Location id
L100001023567
Eia plant ids
66920
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
69
Transmission owner
Tampa Electric Co
Balancing authority code
TEC
Balancing authority name
Tampa Electric Company
Fuel burned (MMBtu), 2025200,347
Capacity factor, 20250.034
Heat rate (Btu/kWh), 20258,861.4
Net generation (MWh), 202522,609
Balancing authority codeTEC

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
South Tampa Energy Storage Postponed Storage 0.2 mi 20
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 6.5 mi 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 6.5 mi 982
Big Bend III Battery Storage Permitted Storage 8.4 mi 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 8.6 mi 99

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution