- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Retired
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- In development
- Under construction
- Retired
Southbridge Energy Center LLC: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Southbridge Energy Center LLC
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2012
- 0 MWh
- Location
- Worcester County, Massachusetts
- Operated by
- AE Operations LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 25 years since 2001
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- July 2011
- First unit retired
- March 2008
- Capacity retired
- 6.5 MW
- Generators retired
- 5
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| ENG2 | Natural Gas Internal Combustion Engine | 1.3 MW | Retired | March 2008 |
| ENG3 | Natural Gas Internal Combustion Engine | 1.3 MW | Retired | April 2009 |
| ENG4 | Natural Gas Internal Combustion Engine | 1.3 MW | Retired | November 2010 |
| ENG1 | Natural Gas Internal Combustion Engine | 1.3 MW | Retired | April 2011 |
| ENG5 | Natural Gas Internal Combustion Engine | 1.3 MW | Retired | July 2011 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- ISNE
Transmission lines within 15 mi (9)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit ENG5 scheduled to retire, 1.3 MW · EIA-860M
- Stated Unit ENG1 scheduled to retire, 1.3 MW · EIA-860M
- Stated Unit ENG4 scheduled to retire, 1.3 MW · EIA-860M
- Stated Unit ENG3 scheduled to retire, 1.3 MW · EIA-860M
- Stated Unit ENG2 scheduled to retire, 1.3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Southbridge Landfill Gas-to-Energy Postponed | Biomass | 2.2 mi | 1.6 |
| Sturbridge Road Solar Under construction | Solar | 7.0 mi | 5 |
| Putnam Meadow Solar Station Filed | Solar | 13.1 mi | 4 |
| KCE CT 1, LLC Announced | Storage | 14.7 mi | 45 |
Sources EIA-860M