Show on map
Southwyck 138 kV line — Transmission linePamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 2.7 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 2.7 mi awayBocanova Energy Storage II — Under construction · Storage · TX · 150 MW · 11.6 mi awayCrowned Heron 2 - Storage, LLC — Built · Storage · TX · 154.2 MW · 12.2 mi awayJack Fusco Energy Center — Postponed · Gas, combined cycle · TX · 400 MW · 12.7 mi awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 12.8 mi awayImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 12.9 mi awayTX17 Nickel Prairie Storage — Postponed · Storage · TX · 100 MW · 13.9 mi away
  • Storage
  • Under construction
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Southwyck 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
6
Substations at the ends (as the source names them)
Southwyck
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID301668
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pamela Heights I Energy Center Under construction Storage 2.7 mi 101.7
Callisto II Energy Center Under construction Storage 2.7 mi 303.2
Bocanova Energy Storage II Under construction Storage 11.6 mi 150
Crowned Heron 2 - Storage, LLC Built Storage 12.2 mi 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 12.7 mi 400
Texas Petrochemicals Postponed Gas, combined cycle 12.8 mi 560
Imperial Power Plant LLC Postponed Gas, reciprocating engine 12.9 mi 12
TX17 Nickel Prairie Storage Postponed Storage 13.9 mi 100

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution