Show on map
Springerville — Power plant · Coal · Tucson Electric Power CoSpringerville — Coal · AZ · 400 MW · 0.0 km away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Springerville

Power plant · Coal

Key facts

Power plant · Coalran 36% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1985
Net generation, 2025
5,549,274 MWh
Grid
345 kV to Tucson Electric Power Co (TEPC)
Location
Apache County, Arizona

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
41 years since 1985
Unused energy
10,037 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,315 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817881, G100000817882, G100000817883
Location id
L100000815052
Eia plant ids
8223
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000600788
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001196
Fuel burned (MMBtu), 202562,787,778
Capacity factor, 20250.356
Heat rate (Btu/kWh), 202511,314.6
Net generation (MWh), 20255,549,273.6
Balancing authority codeTEPC

Solar arrays

Array area (acres)
93.3
AC capacity (MW)
13.6
DC capacity (MW)
16.4
Mounting
Fixed tilt and single-axis tracking
Site type
Greenfield
Began operating
2014

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Next scheduled retirement
December 2027
Last scheduled retirement
December 2032
Capacity scheduled to retire
849.6 MW
Generators scheduled to retire
2
Share of in-service capacity scheduled
48%
Capacity still in service
1,779.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal424.8 MWScheduled to retireDecember 2027
2Conventional Steam Coal424.8 MWScheduled to retireDecember 2032

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV
Transmission or distribution system owner
Tucson Electric Power Co
Balancing authority
Tucson Electric Power Company
NERC region
WECC
Transmission lines within 25 km (6)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

6 companies6
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Tucson Electric Power Co Operator EIA-860M
UNS ENERGY CORP Owner 50.0% 31 Dec 2023 EPA GHGRP
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT & POWER DISTRICT Owner 25.0% 31 Dec 2023 EPA GHGRP
TRI-STATE GENERATION & TRANSMISSION ASSOC INC Owner 25.0% 31 Dec 2023 EPA GHGRP
Springerville Unit 3 Holding LLC Owner 25.7% 31 Dec 2025 EIA-860
Salt River Project Owner 25.7% 31 Dec 2025 EIA-860

Timeline

  • Stated Unit 2 scheduled to retire, 424.8 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 424.8 MW · EIA-860M
  • In service · EIA-860M

Sources

8 sources

Sources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Springerville Postponed Coal 0.0 km 400

Sources EIA-860M

Sources

Attribution