Springview — Power plant · Wind · Bluestem LLC
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Wind

Key facts

Power plant · Windran 39% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
10,188 MWh
Grid
12 kV to Nebraska Public Power District (SWPP)
Location
Keya Paha County, Nebraska
Operated by
Bluestem LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
15 years since 2011
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019643, G100001022787
Location id
L100001017654
Eia plant ids
7771
Fuel burned (MMBtu), 202534,762
Capacity factor, 20250.388
Net generation (MWh), 202510,188
Balancing authority codeSWPP

Wind turbines

Turbines
2
Turbine capacity (MW)
3
Turbine models
2 Vensys Vensys77
Hub height (m)
65
Rotor diameter (m)
77
Year online
2011

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
1.4 MW
Generators retired
2
Capacity still in service
3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Onshore Wind Turbine0.7 MWRetiredOctober 2007
2Onshore Wind Turbine0.7 MWRetiredOctober 2007

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Nebraska Public Power District
Balancing authority
Southwest Power Pool
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • In service · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 1.4 MW · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory