- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Springview: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Springview
Power plant · Wind
Key facts
Power plant · Windran 39% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 10,188 MWh
- Grid
- 12 kV to Nebraska Public Power District (SWPP)
- Location
- Keya Paha County, Nebraska
- Operated by
- Bluestem LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 10,188
MWh - Fuel burned, 2025
- 34,762
MMBtu - Capacity factor, 2025
- 38.8
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 10,188 | 34,762 | 38.8% | — |
| 2024 | 9,707 | 33,119 | 36.8% | — |
| 2023 | 7,382 | 25,186 | 28.1% | — |
| 2022 | 7,126 | 24,314 | 27.1% | — |
| 2021 | 9,736 | 86,104 | 37.0% | — |
| 2020 | 10,066 | 88,248 | 38.2% | — |
| 2019 | 7,568 | 67,392 | 28.8% | — |
| 2018 | 9,306 | 84,724 | 35.4% | — |
| 2017 | 12,350 | 113,781 | 47.0% | — |
| 2016 | 10,692 | 98,708 | 40.6% | — |
| 2015 | 9,445 | 88,018 | 35.9% | — |
| 2014 | 10,472 | 99,591 | 39.9% | — |
| 2007 | 2,295 | 22,684 | 8.7% | — |
| 2006 | 3,860 | 38,287 | 14.7% | — |
| 2005 | 4,253 | 42,526 | 16.2% | — |
| 2004 | 4,100 | 41,090 | 15.6% | — |
| 2003 | 4,800 | 49,157 | 18.3% | — |
| 2002 | 5,341 | 54,334 | 20.3% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
3 sourcesSources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)