Show on map
SR Mavericks — Power plant · Solar · SR Mavericks, LLCAMERICAN HONDA MOTORS CO. - DATA CENTER — Built · Large load · CO · 8.2 mi awayFort St Vrain — Under construction · Gas, combustion turbine · CO · 478 MW · 8.3 mi awaySpindle BESS — Under construction · Storage · CO · 199 MW · 11.7 mi awayFront Range Project — Postponed · Biomass · CO · 1.6 MW · 13.9 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

SR Mavericks

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
14,828 MWh
Grid
12 kV to United Power, Inc (WACM)
Location
Weld County, Colorado
Operated by
SR Mavericks, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817910
Location id
L100000815079
Eia plant ids
60283
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
United Power, Inc
Balancing authority code
WACM
Balancing authority name
Western Area Power Administration - Rocky Mountain Region
Fuel burned (MMBtu), 202550,593
Capacity factor, 20250.217
Net generation (MWh), 202514,828
Balancing authority codeWACM

Solar arrays

Array area (acres)
47.8
AC capacity (MW)
6.5
DC capacity (MW)
8.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AMERICAN HONDA MOTORS CO. - DATA CENTER Built Large load 8.2 mi
Fort St Vrain Under construction Gas, combustion turbine 8.3 mi 478
Spindle BESS Under construction Storage 11.7 mi 199
Front Range Project Postponed Biomass 13.9 mi 1.6

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution