Sterlington

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1973
Net generation, 2025
0 MWh
Grid
115 kV to Entergy Louisiana LLC (MISO)
Location
Ouachita County, Louisiana

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
53 years since 1973
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002045929
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007152
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeMISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
414.7 MW
Generators retired
3
Capacity still in service
59.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
6Natural Gas Steam Turbine247.7 MWRetiredAugust 2012
7CNatural Gas Fired Combined Cycle101 MWRetiredJune 2017
7BNatural Gas Fired Combined Cycle66 MWRetiredJanuary 2019
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine247.7 MW
Natural Gas Fired Combined Cycle167 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Entergy Louisiana LLC
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 15 mi (5)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Entergy Louisiana LLC Operator EIA-860M
Entergy Corp Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit 7B scheduled to retire, 66 MW · EIA-860M
  • Stated Unit 7C scheduled to retire, 101 MW · EIA-860M
  • Stated Unit 6 scheduled to retire, 247.7 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SR South Bastrop Under construction Solar 10.2 mi 4.8
SR North Bastrop Postponed Solar 12.6 mi 4.8

Sources EIA-860M