Subase Microgrid Project

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 46% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
29,610 MWh
Grid
14 kV to Groton Dept of Utilities - (CT) (ISNE)
Location
New London County, Connecticut

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
4 years since 2022
Heat rate
8,044 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.80
Transmission owner
Groton Dept of Utilities - (CT)
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 2025238,169
Capacity factor, 20250.457
Heat rate (Btu/kWh), 20258,043.5
Net generation (MWh), 202529,610
Balancing authority codeISNE

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Connecticut Mun Elec Engy Coop Operator EIA-860M
Fuel Cell Energy Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Subase Microgrid Project Postponed Gas, reciprocating engine 0.0 km 13.1
Groton Flanders Road Landfill Under construction Solar 6.3 km 5
CMEEC - Hollyhock Solar Postponed Solar 14.3 km 6

Sources EIA-860M

Sources

Attribution