Show on map
Substation (OSM way 340120763) — SubstationImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 6.1 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 6.8 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 6.8 mi awayCrowned Heron 2 - Storage, LLC — Built · Storage · TX · 154.2 MW · 11.0 mi awayJack Fusco Energy Center — Postponed · Gas, combined cycle · TX · 400 MW · 11.7 mi away
  • Storage
  • Under construction
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Substation (OSM way 340120763)

Substation

Key facts

Substation Operating
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Osm id340120763
RegionUS-TX
Outline
Type
Polygon
Coordinates
-95.56, 29.63, -95.56, 29.63, -95.56, 29.63, -95.56, 29.63, -95.56, 29.63
Osm typeway
Voltage (kV)138
Voltage raw138000
Voltages kv138
Scope regionsUS-TX
Voltage class100-161 kV
States crossedUS-TX
Extract regionsUS-TX
Location methodarea_centroid
Substation typeindustrial
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Imperial Power Plant LLC Postponed Gas, reciprocating engine 6.1 mi 12
Callisto II Energy Center Under construction Storage 6.8 mi 303.2
Pamela Heights I Energy Center Under construction Storage 6.8 mi 101.7
Crowned Heron 2 - Storage, LLC Built Storage 11.0 mi 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 11.7 mi 400

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution