Show on map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Operating
Summit Winds: location and 18 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Summit Winds
Power plant · Wind
Key facts
Power plant · Windran 38% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 191,268 MWh
- Grid
- 60 kV to Pacific Gas & Electric Co. (CISO)
- Location
- Alameda County, California
- Operated by
- Greenbacker Renewable Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 652,607 |
| Capacity factor, 2025 | 0.380 |
| Net generation (MWh), 2025 | 191,268 |
| Balancing authority code | CISO |
Wind turbines
- Turbines
- 23
- Turbine capacity (MW)
- 62.1
- Turbine models
- 23 GE Wind GE2.7-116
- Hub height (m)
- 90
- Rotor diameter (m)
- 116
- Year online
- 2021
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine Database (USWTDB) — USGS, American Clean Power Association and LBNL; one row per turbineMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Rooney Ranch Filed | Wind | 4.3 km | 21 |
| Tres Vaqueros Wind Farms LLC Withdrawn | Wind | 4.5 km | 28.3 |
| Buena Vista Energy LLC Postponed | Storage | 5.3 km | 100 |
| Aramis I Solar Project × 2 units Under construction | Storage | 6.8 km | 200 |
| Sand Hill A Filed | Wind | 7.5 km | 13.5 |
| Sand Hill B Filed | Wind | 8.3 km | 17 |
| Sand Hill C Contracted | Wind | 8.4 km | 80.8 |
| Mulqueeney Wind Energy Under construction | Wind | 11.4 km | 80 |
| TESLA Power Project Postponed | Gas, combined cycle | 11.6 km | 1,322 |
| NorCal FPV 1 Under construction | Solar | 15.2 km | 10 |
| NorCal FPV 1 (Pond 2) Under construction | Solar | 15.2 km | 1.8 |
| Tracy BESS Under construction | Storage | 18.5 km | 40 |
| Zeus BESS Contracted | Storage | 18.6 km | 200 |
| Tracy Renewable Power Plant Under construction | Biomass | 23.4 km | 5 |
| Bishop Ranch - BR 3-HH Under construction | Solar + storage | 23.5 km | 1.4 |
| Bishop Ranch - BR 3-GG Under construction | Solar + storage | 23.5 km | 1.9 |
| Bishop Ranch - BR 3-FF Under construction | Solar + storage | 23.6 km | 1.4 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO