Show on map
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Other infrastructure
Sunset - Junction: route and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Sunset - Junction
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-CA
- Operated by
- Phillips 66 PipelineSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 52
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | PHILLIPS 66 PIPELINE |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Sunset - Junction |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Maricopa West Solar 2 Withdrawn | Solar | 6.6 km | 20 |
| Pistachio Road 1726-WD Under construction | Solar | 8.3 km | 4.8 |
| Hydrogen Energy California LLC Withdrawn | Coal | 13.1 km | 421 |
| Chalan Under construction | Solar + storage | 13.2 km | 64.9 |
| Gardenia 1 Announced | Solar + storage | 15.7 km | 6 |
| Chevron - Lost Hills Hybrid Postponed | Storage | 17.0 km | 10 |
| Pelicans Jaw Hybrid Solar Under construction | Solar + storage | 22.8 km | 678.5 |
| Jasmine Under construction | Solar + storage | 24.8 km | 70 |
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- CAISO Public Queue ReportSource: California ISO