Show on map
Tampa Bay - Clearview 138 kV — Transmission lineH L Culbreath Bayside Power Station — Postponed · Gas, combustion turbine · FL · 503.8 MW · 5.7 mi awayTampa Electric Co NA 2 — Postponed · Gas, combustion turbine · FL · 982 MW · 5.7 mi awaySouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 6.3 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 12.5 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 12.5 mi away
  • Storage
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Tampa Bay - Clearview 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-FL

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
2
Substations at the ends (as the source names them)
Tampa Bay to Clearview
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID132981
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 5.7 mi 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 5.7 mi 982
South Tampa Energy Storage Postponed Storage 6.3 mi 20
Big Bend III Battery Storage Permitted Storage 12.5 mi 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 12.5 mi 99

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution