Tesoro SLC Cogeneration Plant — Power plant · Gas, combustion turbine · Tesoro Refng Marketing Co Mntn RegionDATA CENTER (200 S 200 E SLC) — Built · Large load · UT · 2.2 mi awayALIGNED DATA CENTER SLC-4 — Built · Large load · UT · 9.0 mi awayKennecott Power Plant — Postponed · Gas, combined cycle · UT · 214.3 MW · 12.7 mi awayCONDUENT DATA CENTER — Large load · UT · 13.9 mi away
  • Combustion
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Tesoro SLC Cogeneration Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 75% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2004
Net generation, 2025
198,679 MWh
Grid
138 kV, 46 kV, 14 kV to PacifiCorp (PACE)
Location
Salt Lake County, Utah

Output

Net generation MWh by year, 2006 to 2026
Fuel burned MMBtu by year, 2006 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
22 years since 2004
Unused energy
68 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,168 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
138, 46, 13.80
Transmission owner
PacifiCorp
Balancing authority code
PACE
Balancing authority name
PacifiCorp - East
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000469243
Subparts reported
MM
NAICS code
324110
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1010653
Fuel burned (MMBtu), 20252,218,889
Capacity factor, 20250.746
Heat rate (Btu/kWh), 202511,168.2
Net generation (MWh), 2025198,679.0
Balancing authority codePACE

Ownership

4 companies16
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Marathon Petroleum Company LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
Marathon Petroleum Company LP Owner 100.0% Dec 31, 2023 EPA GHGRP
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
MARATHON PETROLEUM CO LP Owner 100.0% Dec 31, 2025 EIA-860
Tesoro Refng Marketing Co Mntn Region Operator EIA-860M

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DATA CENTER (200 S 200 E SLC) Built Large load 2.2 mi
ALIGNED DATA CENTER SLC-4 Built Large load 9.0 mi
Kennecott Power Plant Postponed Gas, combined cycle 12.7 mi 214.3
CONDUENT DATA CENTER Unknown Large load 13.9 mi

Sources EPA ICIS-NPDES · EIA-860M