Show on map
- Wind & solar
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Other infrastructure
Trinidad: location and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Trinidad
Gas processing plant
Key facts
Gas processing plant Operating- Location
- Henderson County, Texas
- Operated by
- Enbridge G & P (East Texas) L.P.
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Capacity (MMcf/d)
- 65
Capacity not stated
All 12 attributes from EIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)
| Attribute | Value |
|---|---|
| City | Trinidad |
| EPA greenhouse gas reporting (GHGRP) |
|
| Source period | 2017 |
| Dry gas storage capacity | 0 |
| NGL storage capacity | 476 |
| ZIP code | 75163 |
| Owner, as the source states it | Enbridge G & P (East Texas) L.P. |
| Heat content (Btu per cubic foot) | 1,049 |
| Operator, as the source states it | Enbridge G & P (East Texas) L.P. |
| Capacity (MMcf/d) | 65 |
| Source release | 2017_v2 |
| Plant flow (MMcf/d) | 52 |
Ownership
2 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| M6 MIDSTREAM LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Enbridge G & P (East Texas) L.P. | Operator | EIA Energy Atlas | ||
| Enbridge G & P (East Texas) L.P. | Owner | EIA Energy Atlas |
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Brittlebush Solar and Battery Storage Postponed | Solar + storage | 7.3 mi | 800 |
| Itsee Solar Postponed | Solar | 9.0 mi | 53.3 |
| Armadillo Solar Center Under construction | Solar | 11.2 mi | 150.5 |
| Forest Grove - Dodd Postponed | Solar + storage | 11.4 mi | 302 |
| Bluebonnet Prairie Wind Under construction | Wind | 12.7 mi | 180 |
| Elm Flats Solar Under construction | Solar + storage | 12.9 mi | 375.8 |