Show on map
Bluebonnet Prairie WindElm Flats Solar — Under construction · Solar + storage · TX · 375.8 MW · 2.1 mi awayItsee Solar — Postponed · Solar · TX · 53.3 MW · 7.2 mi awayArmadillo Solar Center — Under construction · Solar · TX · 150.5 MW · 11.5 mi awayWensowitch Solar Park — Permitted · Solar · TX · 146.1 MW · 11.6 mi awayMain Horn Solar — Studied · Solar · TX · 100.4 MW · 11.6 mi awayWhistle Solar — Studied · Solar · TX · 56.3 MW · 13.5 mi awayOak Valley Solar — Studied · Solar · TX · 251.3 MW · 14.7 mi away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Bluebonnet Prairie Wind

Wind

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Navarro County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “Wind - Wind Turbine”
Capacity (MW)
180 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 170 MW nameplate.
Connects at
Tap 138kV 200 CHATFIELD - 3789 TRINPLAINS_8Connection point180 MW active (1 of 1 projects).
EIA plant
68082 generator BBP

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elm Flats Solar Under construction Solar + storage 2.1 mi 375.8
Itsee Solar Postponed Solar 7.2 mi 53.3
Armadillo Solar Center Under construction Solar 11.5 mi 150.5
Wensowitch Solar Park Permitted Solar 11.6 mi 146.1
Main Horn Solar Studied Solar 11.6 mi 100.4
Whistle Solar Studied Solar 13.5 mi 56.3
Oak Valley Solar Studied Solar 14.7 mi 251.3

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution