Show on map
Tropico Solar PV Plant — Power plant · Solar · Arevon Energy, Inc.Rexford 2 Solar Farm — Contracted · Solar + storage · CA · 200 MW · 4.5 mi awayRanch 4701 — Under construction · Solar · CA · 2.3 MW · 6.3 mi awaySolar Photovoltaic Project #35 — Postponed · Solar · CA · 7 MW · 11.2 mi awaySolar Photovoltaic Project #46 — Postponed · Solar · CA · 3.5 MW · 11.5 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Tropico Solar PV Plant

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
32,440 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Tulare County, California
Operated by
Arevon Energy, Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818239
Location id
L100000815376
Eia plant ids
59599
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025110,685
Capacity factor, 20250.265
Net generation (MWh), 202532,440
Balancing authority codeCISO

Solar array

Array area (acres)
69.4
AC capacity (MW)
14
DC capacity (MW)
18.2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rexford 2 Solar Farm Contracted Solar + storage 4.5 mi 200
Ranch 4701 Under construction Solar 6.3 mi 2.3
Solar Photovoltaic Project #35 Postponed Solar 11.2 mi 7
Solar Photovoltaic Project #46 Postponed Solar 11.5 mi 3.5

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 15, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution