TX7 Flat Top

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
-423 MWh
Grid
25 kV to South Texas Electric Coop, Inc (ERCO)
Location
Reeves County, Texas
Operated by
Key Capture EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
6 years since 2020
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
25
Transmission owner
South Texas Electric Coop, Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-423
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -423.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Chiltepin Solar Postponed Solar 18.6 km 100
Saddleback BESS2 Under construction Other 19.9 km 9.9

Sources EIA-860M