- Storage
- In development
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Storage
- In development
- Operating
- Other companies nearby
12 assets · 6 projects
12 assets · 6 projects. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 5 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
Key Capture Energy
Independent power producer
Key facts
Independent power producer · 599.7 MW- Capacity held
- 599.7MW
- Assets
- 12
- Projects
- 11
- States
- NY, TX
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why
Gross output of plants with a stake
12 of 12 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 12 of 12 plants with a stake: US plants with an EIA monthly series.0% of the output is from 12 plants recorded as wholly owned.12 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Storage
Yearly totals
| Year | Storage | Total (MWh) |
|---|---|---|
| 2026 (part year) | -55,549 | -55,549 |
| 2025 | -75,528 | -75,528 |
| 2024 | -41,380 | -41,380 |
| 2023 | -15,774 | -15,774 |
| 2022 (part year) | -966 | -966 |
Projects 11
Capacity
0.92 GW
0.40 GW active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Postponed | KCE NY 35, LLC | Storage | 200 MW | NY | — | EIA-860M |
| Filed | NY2 Battery | Storage | 151.5 MW | NY | Online Jul 1, 2028 | EIA-860M |
| Postponed | TX 14 Venus Mill Storage | Storage | 100 MW | TX | — | EIA-860M |
| Postponed | TX17 Nickel Prairie Storage | Storage | 100 MW | TX | — | EIA-860M |
| Postponed | TX18 Cottage Meadow Storage | Storage | 100 MW | TX | — | EIA-860M |
| Announced | KCE NY 29, LLC | Storage | 79 MW | NY | Online Mar 1, 2030 | EIA-860M |
| Announced | KCE NY 31, LLC | Storage | 50 MW | NY | Online May 1, 2031 | EIA-860M |
| Announced | KCE NY 30, LLC | Storage | 50 MW | NY | Online Dec 1, 2030 | EIA-860M |
| Announced | KCE CT 1, LLC | Storage | 45 MW | CT | Online Apr 1, 2031 | EIA-860M |
| Postponed | KCE NY 36, LLC | Storage | 20 MW | NY | — | EIA-860M |
| Announced | KCE NY 10, LLC | Storage | 20 MW | NY | Online Oct 1, 2028 | EIA-860M |
Sources EIA-860M
Assets 12
Assets
12
Capacity
600 MW
- Storage: 600 MW, 12 assets
Operates 12 power plants
Sources EIA-860M
Sources 2
Registers
2
Reuse terms
- 2 Open license
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Around this company
Nearby 34
within 15 miProjects
34
within 15 mi
Nearest
0.5 mi
Pecan Crossing Building 2 (Pflugerville data centre)
All 34NearbyShowing all 34 nearby projects. They fill 33 rows, as a project's generator units share a row.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Filed | Pecan Crossing Building 2 (Pflugerville data centre) | Large load | — | 0.5 mi away | nearest: TX12 Silicon Hill Storage |
| Under construction | Castor | Storage | 200 MW | 0.9 mi away | nearest: TX23 Roughneck Storage |
| Contracted | Bell Creek BESS LLC | Storage | 200.9 MW | 1.5 mi away | nearest: TX23 Roughneck Storage |
| Contracted | Brazos River BESS LLC | Storage | 180.4 MW | 2.6 mi away | nearest: TX23 Roughneck Storage |
| Studied | Second Division Solar | Storage | 30 MW | 4.8 mi away | nearest: TX23 Roughneck Storage |
| Under construction | AUSTIN DATA CENTER 2 | Large load | — | 5.6 mi away | nearest: TX12 Silicon Hill Storage |
| Contracted | Elio Energy LLC | Storage | 205.3 MW | 6.3 mi away | nearest: TX23 Roughneck Storage |
| Under construction | Blue Jay Solar I, LLC | Solar | 210 MW | 6.5 mi away | nearest: TX15 Limousin Oak Storage |
| Postponed | Two Rivers Solar | Solar | 214 MW | 6.6 mi away | nearest: TX11 Republic Road Storage |
| Under construction | SABEY DATA CENTER AUSTIN | Large load | — | 6.9 mi away | nearest: TX12 Silicon Hill Storage |
| Filed | Building B (Round Rock data centre) | Large load | — | 6.9 mi away | nearest: TX12 Silicon Hill Storage |
| Under construction | Nash Solar | Solar | 10 MW | 7.7 mi away | nearest: TX23 Roughneck Storage |
| Under construction | NSCALE DATA CENTER - WARD COUNTY | Large load | — | 8.0 mi away | nearest: TX8 Worsham |
| Postponed | Stargate Point Comfort | Gas, combustion turbine | 250 MW | 8.5 mi away | nearest: TX2 Port Lavaca |
| Under construction | CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TX | Large load | — | 9.4 mi away | nearest: TX10 Hummingbird Storage |
| Built | HUTTO DATA CENTER CAMPUS | Large load | — | 9.4 mi away | nearest: TX12 Silicon Hill Storage |
| Under construction | Saddleback BESS2 | Other | 9.9 MW | 9.7 mi away | nearest: TX8 Worsham |
| Studied | Oakley BESS | Storage | 201 MW | 9.7 mi away | nearest: TX10 Hummingbird Storage |
| Studied | Sandow Lakes Energy Station | Gas, combustion turbine | 1,291.6 MW | 9.8 mi away | nearest: TX21 River Valley Storage 2 |
| Under construction | Office Building (Denton data centre) | Large load | — | 9.8 mi away | nearest: TX10 Hummingbird Storage |
| Announced | KCE NY 10, LLC | Storage | 20 MW | 11.1 mi away | nearest: NY6 Battery |
| Built | DFW VII DATA CENTER | Large load | — | 11.4 mi away | nearest: TX10 Hummingbird Storage |
| Postponed | Chiltepin Solar | Solar | 100 MW | 11.5 mi away | nearest: TX7 Flat Top |
| Under construction | Knapp BESS | Storage | 10 MW | 11.9 mi away | nearest: TX13 Endurance Park Storage |
| Studied | Sandford Solar and Storage | Solar + storage | 227.1 MW | 12.4 mi away | nearest: TX10 Hummingbird Storage |
| Postponed | Windmill Ridge Storage | Storage | 151.4 MW | 12.8 mi away | nearest: TX23 Roughneck Storage |
| Postponed | Dogwood Creek Solar and BESS | Solar + storage | 878.7 MW | 13.3 mi away | nearest: TX21 River Valley Storage 2 |
| Under construction | Austin TX GigaFactory × 2 units | Solar | 3.3 MW | 13.5 mi away | nearest: TX12 Silicon Hill Storage |
| Under construction | CPV Basin Ranch Energy Center | Gas, combined cycle | 1,350 MW | 13.6 mi away | nearest: TX8 Worsham |
| Under construction | Hoyte Solar | Solar | 206.8 MW | 14.1 mi away | nearest: TX11 Republic Road Storage |
| Permitted | Wittig Solar Park | Solar | 106.9 MW | 14.1 mi away | nearest: TX23 Roughneck Storage |
| Under construction | Coyanosa Gas | Gas, reciprocating engine | 10 MW | 14.4 mi away | nearest: TX8 Worsham |
| Under construction | Myrtle Solar, LLC | Solar | 313 MW | 15.0 mi away | nearest: TX23 Roughneck Storage |
Sources FAA OE/AAA · EIA-860M · ERCOT · EPA ICIS-NPDES