Show on map
TX8 Worsham — Power plant · Storage · Key Capture EnergyNSCALE DATA CENTER - WARD COUNTY — Under construction · Large load · TX · 8.0 mi awaySaddleback BESS2 — Under construction · Other · TX · 9.9 MW · 9.7 mi awayChiltepin Solar — Postponed · Solar · TX · 100 MW · 11.9 mi awayCPV Basin Ranch Energy Center — Under construction · Gas, combined cycle · TX · 1,350 MW · 13.6 mi awayCoyanosa Gas — Under construction · Gas, reciprocating engine · TX · 10 MW · 14.4 mi away
  • Combustion
  • Storage
  • Unspecified fuel
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

TX8 Worsham

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
-378 MWh
Grid
12 kV to South Texas Electric Coop, Inc (ERCO)
Location
Pecos County, Texas
Operated by
Key Capture EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
6 years since 2020
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
South Texas Electric Coop, Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-378
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -378.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NSCALE DATA CENTER - WARD COUNTY Under construction Large load 8.0 mi
Saddleback BESS2 Under construction Other 9.7 mi 9.9
Chiltepin Solar Postponed Solar 11.9 mi 100
CPV Basin Ranch Energy Center Under construction Gas, combined cycle 13.6 mi 1,350
Coyanosa Gas Under construction Gas, reciprocating engine 14.4 mi 10

Sources EPA ICIS-NPDES · EIA-860M · ERCOT

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution