Valero Refinery Corpus Christi West — Power plant · Oil · Valero Refining CoM&G Resins USA — Under construction · Other · TX · 28.6 MW · 1.5 mi awayCumbia Energy Center — Announced · Storage · TX · 200 MW · 5.8 mi awayBEACON POINT DATA CENTER PROJECT — Under construction · Large load · TX · 8.5 mi away
  • Combustion
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Valero Refinery Corpus Christi West

Power plant · Oil

Key facts

Power plant · Oilran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1983
Net generation, 2025
82,083 MWh
Grid
138 kV to AEP Texas Central Company (ERCO)
Location
Nueces County, Texas

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Coke”
Age
43 years since 1983
Unused energy
524 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,418 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20251,183,480
Capacity factor, 20250.135
Heat rate (Btu/kWh), 202514,418.1
Net generation (MWh), 202582,083
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
7.5 MW
Generators retired
1
Capacity still in service
69.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
TG3Other Gases7.5 MWRetiredAugust 2006

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
AEP Texas Central Company
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Valero Refining Co Operator EIA-860M
VALERO ENERGY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit TG3 scheduled to retire, 7.5 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
M&G Resins USA Under construction Other 1.5 mi 28.6
Cumbia Energy Center Announced Storage 5.8 mi 200
BEACON POINT DATA CENTER PROJECT Under construction Large load 8.5 mi