Show on map
Vincent - Pearblossom 230 kV — Transmission linePalmdale Water District 6MG Tank — Under construction · Solar + storage · CA · 1.3 MW · 4.1 mi awayTierra Bonita Solar — Postponed · Solar · CA · 22 MW · 5.5 mi awayPalmdale Water District HQ — Under construction · Solar · CA · 1.7 MW · 6.0 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Vincent - Pearblossom 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Southern California Edison

Details

Who’s behind it

Owner
Southern California Edison

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
13
Substations at the ends (as the source names them)
Vincent to Pearblossom
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itsouthern california edison
HIFLD line ID313780
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Palmdale Water District 6MG Tank Under construction Solar + storage 4.1 mi 1.3
Tierra Bonita Solar Postponed Solar 5.5 mi 22
Palmdale Water District HQ Under construction Solar 6.0 mi 1.7

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution