Show on map
Waco Solar — Power plant · Solar · Waco Solar, LLCWaco Solar II — Announced · Solar · TX · 200 MW · 1.6 mi awayFindley PV and BESS — Studied · Solar + storage · TX · 102.1 MW · 5.2 mi awayNEXUS DATA CENTER HUBBARD — Under construction · Large load · TX · 9.0 mi awayNEXUS DATA CENTER - APEX PROJECT — Under construction · Large load · TX · 9.5 mi awayPayne Battlecreek Solar — Contracted · Solar · TX · 85 MW · 10.5 mi awayTradinghouse — Postponed · Gas, combustion turbine · TX · 471 MW · 12.8 mi awayEytcheson Solar — Studied · Solar · TX · 76.4 MW · 13.2 mi awayPepper Solar Farm — Contracted · Solar · TX · 120.7 MW · 13.5 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
910,497 MWh
Grid
345 kV to Lone Star Transmission (ERCO)
Location
Limestone County, Texas
Operated by
Waco Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000839095
Location id
L100000833370
Eia plant ids
65762
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Lone Star Transmission
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,106,617
Capacity factor, 20250.260
Net generation (MWh), 2025910,497
Balancing authority codeERCO

Solar arrays

Array area (acres)
2,143.1
AC capacity (MW)
400
DC capacity (MW)
400
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Waco Solar II Announced Solar 1.6 mi 200
Findley PV and BESS Studied Solar + storage 5.2 mi 102.1
NEXUS DATA CENTER HUBBARD Under construction Large load 9.0 mi
NEXUS DATA CENTER - APEX PROJECT Under construction Large load 9.5 mi
Payne Battlecreek Solar Contracted Solar 10.5 mi 85
Tradinghouse Postponed Gas, combustion turbine 12.8 mi 471
Eytcheson Solar Studied Solar 13.2 mi 76.4
Pepper Solar Farm Contracted Solar 13.5 mi 120.7

Sources EIA-860M · ERCOT · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution