Show on map
- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
WAL1103: location and 5 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
WAL1103
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2019
- Net generation, 2025
- 385 MWh
- Grid
- 0.5 kV to CenterPoint Energy (ERCO)
- Location
- Harris County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 7 years since 2019
- Unused energy
- 10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 10,000 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 3,850 |
| Capacity factor, 2025 | 0.037 |
| Heat rate (Btu/kWh), 2025 | 10,000 |
| Net generation (MWh), 2025 | 385 |
| Balancing authority code | ERCO |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| SERVERFARM LONGHORN Under construction | Large load | 7.4 km | |
| SMT DC Houston 1 (Tomball data centre) Filed | Large load | 13.5 km | |
| SMT DC Houston II (Houston data centre) Filed | Large load | 14.9 km | |
| John Paul Jones Postponed | Gas, reciprocating engine | 15.5 km | 18.7 |
| BESS TX Camarine - BSHOU001 Under construction | Storage | 15.6 km | 9.9 |
Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M