WAL4526 — Power plant · Gas, reciprocating engine · Walmart Stores Texas, LLCBESS TX Camarine - BSHOU001 — Storage · TX · 9.9 MW · 6.6 km awayTX Houston 7080 Express Lane — Storage · TX · 1.5 MW · 12.6 km awayGreens Bayou 6 — Gas, combustion turbine · TX · 445 MW · 15.4 km awayCPV Pondera King Energy Center — Gas, combined cycle · TX · 900 MW · 17.8 km awayTexas Petrochemicals — Gas, combined cycle · TX · 560 MW · 18.8 km awayPamela Heights I Energy Center — Storage · TX · 101.7 MW · 21.7 km awayCallisto II Energy Center — Storage · TX · 303.2 MW · 21.7 km awaySMT DC Houston II (Houston data centre) — Large load · TX · 21.9 km away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 3% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
316 MWh
Grid
0.5 kV to CenterPoint Energy (ERCO)
Location
Harris County, Texas
Operated by
Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
5 years since 2021
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,010 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
0.500
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,163
Capacity factor, 20250.030
Heat rate (Btu/kWh), 202510,009.5
Net generation (MWh), 2025316
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
BESS TX Camarine - BSHOU001 Under construction Storage 6.6 km 9.9
TX Houston 7080 Express Lane Postponed Storage 12.6 km 1.5
Greens Bayou 6 Under construction Gas, combustion turbine 15.4 km 445
CPV Pondera King Energy Center Postponed Gas, combined cycle 17.8 km 900
Texas Petrochemicals Postponed Gas, combined cycle 18.8 km 560
Pamela Heights I Energy Center Under construction Storage 21.7 km 101.7
Callisto II Energy Center Under construction Storage 21.7 km 303.2
SMT DC Houston II (Houston data centre) Filed Large load 21.9 km