Wansley — Power plant · Coal · Georgia Power CoYates — Under construction · Gas, combustion turbine · GA · 1,448.4 MW · 8.4 mi away
  • Combustion
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 5% of 2022 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1976
Net generation, 2022
897,924 MWh
Grid
500 kV to Georgia Power Co (SOCO)
Location
Heard County, Georgia
Operated by
Georgia Power Co

Output

Net generation MWh by year, 2001 to 2023
Fuel burned MMBtu by year, 2001 to 2023
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
50 years since 1976
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Southern Co
Share pct
53.50
Gem entity id
E100000001309
Name
Oglethorpe Power Corp
Share pct
30
Gem entity id
E100000002297
Name
Municipal Electric Authority of Georgia
Share pct
15.10
Gem entity id
E100000002285
Name
Dalton Utilities Inc
Share pct
1.40
Gem entity id
E100001001267
Unit ids
G100000110728, G100000110729, G100001055152
Location id
L100000103848
Eia plant ids
5, 6052
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110050259474
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001015
Balancing authority codeSOCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2022
Capacity retired
1,956.8 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal952 MWRetiredSeptember 2022
2Conventional Steam Coal952 MWRetiredSeptember 2022
5APetroleum Liquids52.8 MWRetiredSeptember 2022
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal1,904 MW
Petroleum Liquids52.8 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
500 kV
Transmission or distribution system owner
Georgia Power Co
Balancing authority
Southern Company Services, Inc. - Trans
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

7 companies9
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Dalton Utilities Owner 1.4% Dec 31, 2025 EIA-860
Municipal Electric Authority - (GA) Owner 15.1% Dec 31, 2025 EIA-860
SOUTHERN CO Owner 72.0% Dec 31, 2023 EPA GHGRP
Oglethorpe Power Corporation Owner 18.0% Dec 31, 2023 EPA GHGRP
CITY OF DALTON GEORGIA Owner 1.0% Dec 31, 2023 EPA GHGRP
Georgia Power Co Owner 53.5% Dec 31, 2025 EIA-860
Oglethorpe Power Corporation Owner 30.0% Dec 31, 2025 EIA-860
MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA Owner 9.0% Dec 31, 2023 EPA GHGRP
Georgia Power Co Operator EIA-860M

Timeline

  • Stated Units 1, 2, 5A scheduled to retire, 1,956.8 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Yates Under construction Gas, combustion turbine 8.4 mi 1,448.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026