Show on map
Warner Lambert — Power plant · Oil · University of Michigan NCampus ResearchWheeler Center Solar Park — Solar · MI · 20 MW · 8.8 km awayVoyager Energy Storage — Storage · MI · 100 MW · 19.4 km awayProject Cannoli Data Center — Large load · MI · 23.7 km away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Warner Lambert

Power plant · Oil

Key facts

Power plant · Oilran 22% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2025
24,329 MWh
Grid
40 kV to DTE Electric Company (MISO)
Location
Washtenaw County, Michigan
Operated by
University of Michigan NCampus ResearchSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
37 years since 1989
Heat rate
17,872 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
40
Transmission owner
DTE Electric Company
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Eia status
By code
OP
Mw
3
Units
1
SB
Mw
9.40
Units
5
Standby mw
9.40
Status rule
majority_mw_standby
In service mw
12.40
Out of service mw
0
Fuel burned (MMBtu), 2025434,799
Capacity factor, 20250.224
Heat rate (Btu/kWh), 202517,871.6
Net generation (MWh), 202524,329
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Wheeler Center Solar Park Postponed Solar 8.8 km 20
Voyager Energy Storage Under construction Storage 19.4 km 100
Project Cannoli Data Center Filed Large load 23.7 km