Waste Management Piedmont LFGTE Project

Power plant · Biomass

Key facts

Power plant · Biomassran 64% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
8,953 MWh
Grid
12 kV to Duke Energy Carolinas, LLC (DUK)
Location
Forsyth County, North Carolina

Output

Net generation MWh by year, 2011 to 2025
Fuel burned MMBtu by year, 2011 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
15 years since 2011
Heat rate
12,926 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110001504729
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007456
Fuel burned (MMBtu), 2025115,724
Capacity factor, 20250.639
Heat rate (Btu/kWh), 202512,925.7
Net generation (MWh), 20258,953
Balancing authority codeDUK

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
0.8 MW
Generators retired
1
Capacity still in service
1.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN2Landfill Gas0.8 MWRetiredMay 2023

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Duke Energy Carolinas, LLC
Balancing authority
Duke Energy Carolinas
NERC region
SERC
Transmission lines within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
WM Renewable Energy LLC Operator EIA-860M
WASTE MANAGEMENT INC Owner 100.0% Dec 31, 2023 EPA GHGRP
Waste Management of Carolinas Inc Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit GEN2 scheduled to retire, 0.8 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bear Branch Solar Under construction Solar 11.3 mi 34.5
Pinewood Solar Center LLC Postponed Solar 14.9 mi 5
Adams Solar Postponed Solar 14.9 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution