Show on map
Waste Mangement Redwood LFGTE — Power plant · Biomass · WM Renewable Energy LLCSCWA R5 Pond Solar — Postponed · Solar · CA · 2 MW · 9.2 mi away
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Waste Mangement Redwood LFGTE

Power plant · Biomass

Key facts

Power plant · Biomassran 62% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
21,817 MWh
Grid
12 kV to Pacific Gas & Electric Co (CISO)
Location
Marin County, California
Operated by
WM Renewable Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025
Fuel burned MMBtu by year, 2017 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
9 years since 2017
Heat rate
11,611 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Pacific Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025253,320
Capacity factor, 20250.623
Heat rate (Btu/kWh), 202511,611.1
Net generation (MWh), 202521,817
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SCWA R5 Pond Solar Postponed Solar 9.2 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution