- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
Waste Mangement Redwood LFGTE: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Waste Mangement Redwood LFGTE
Power plant · Biomass
Key facts
Power plant · Biomassran 62% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2017
- Net generation, 2025
- 21,817 MWh
- Grid
- 12 kV to Pacific Gas & Electric Co (CISO)
- Location
- Marin County, California
- Operated by
- WM Renewable Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 21,817
MWh - Fuel burned, 2025
- 253,320
MMBtu - Capacity factor, 2025
- 62.3
% - Heat rate, 2025
- 11,611
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 21,817 | 253,320 | 62.3% | 11,611 |
| 2024 | 13,092 | 147,425 | 37.3% | 11,261 |
| 2023 | 5,920 | 68,325 | 16.9% | 11,541 |
| 2022 | 20,479 | 240,515 | 58.4% | 11,744 |
| 2021 | 24,129 | 275,915 | 68.9% | 11,435 |
| 2020 | 25,530 | 285,580 | 72.7% | 11,186 |
| 2019 | 28,261 | 327,810 | 80.7% | 11,599 |
| 2018 | 28,524 | 322,489 | 81.4% | 11,306 |
| 2017 (8 of 12 months) | 16,799 | 183,744 | — | 10,938 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.