Show on map
Westport MA 2 Community Solar — Power plant · Solar · Navisun LLCBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 2.8 mi awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 6.0 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 7.2 mi awaySalt Cod BESS — Filed · Storage · MA · 168 MW · 9.3 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 10.4 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 11.4 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 11.4 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 12.1 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 12.7 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 12.7 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 13.3 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 13.6 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 14.0 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 14.0 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Westport MA 2 Community Solar

Power plant · Solar

Key facts

Power plant · Solarran 14% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
1,520 MWh
Grid
13 kV to NSTAR Electric Company (ISNE)
Location
Bristol County, Massachusetts
Operated by
Navisun LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
10 years since 2016
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818609
Location id
L100000815725
Eia plant ids
60476
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20255,186
Capacity factor, 20250.145
Net generation (MWh), 20251,520
Balancing authority codeISNE

Solar array

Array area (acres)
7.4
AC capacity (MW)
1.2
DC capacity (MW)
1.6
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2016

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Borrego - Highland Ave Under construction Solar + storage 2.8 mi 10
Tiverton Power Plant Postponed Gas, combined cycle 6.0 mi 289.8
CONGRUITY 360 LLC Built Large load 7.2 mi
Salt Cod BESS Filed Storage 9.3 mi 168
MA Acushnet 540R Main St Filed Solar + storage 10.4 mi 6
Randall Lane Solar Under construction Solar + storage 11.4 mi 10
Clems Way Solar Permitted Solar 11.4 mi 5
Cushman Road Solar Filed Solar + storage 12.1 mi 6
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 12.7 mi 4.5
Featherbed Lane South Solar Under construction Solar + storage 12.7 mi 2
Braley Hill North Solar Under construction Solar + storage 13.3 mi 10
Snipatuit Road Solar Under construction Solar + storage 13.6 mi 8
Logging Swamp South Permitted Solar 14.0 mi 5
Logging Swamp North Permitted Solar 14.0 mi 5

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution