Show on map
White Oak - Heights Reit 138 kV — Transmission lineBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 3.5 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 9.4 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 9.9 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 9.9 mi awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 10.4 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 11.1 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 13.7 mi awaySERVERFARM LONGHORN — Under construction · Large load · TX · 14.6 mi away
  • Combustion
  • Storage
  • Loads
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

White Oak - Heights Reit 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Centerpoint Energy Houston Electric

Details

Who’s behind it

Owner
Centerpoint Energy Houston Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
5
Substations at the ends (as the source names them)
White Oak to Heights Reit
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcenterpoint energy houston electric
HIFLD line ID305511
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BESS TX Camarine - BSHOU001 Under construction Storage 3.5 mi 9.9
TX Houston 7080 Express Lane Postponed Storage 9.4 mi 1.5
Pamela Heights I Energy Center Under construction Storage 9.9 mi 101.7
Callisto II Energy Center Under construction Storage 9.9 mi 303.2
Texas Petrochemicals Postponed Gas, combined cycle 10.4 mi 560
Greens Bayou 6 Under construction Gas, combustion turbine 11.1 mi 445
CPV Pondera King Energy Center Postponed Gas, combined cycle 13.7 mi 900
SERVERFARM LONGHORN Under construction Large load 14.6 mi

Sources EIA-860M · ERCOT · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution