Willard Sw 115 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-NM
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 52
- Substations at the ends (as the source names them)
- Willard Sw
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 310070 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| La Luz Energy Center Postponed | Gas, combustion turbine | 0.1 mi | 42.3 |
| Valencia Energy Facility Postponed | Gas, combustion turbine | 0.2 mi | 496.6 |
| Trigo Sol Solar CSG Under construction | Solar | 3.1 mi | 4.6 |
| Star Light Energy Center Under construction | Solar + storage | 8.5 mi | 200 |
| USS Meadow Lake Solar Under construction | Solar | 13.0 mi | 3 |