Show on map
Wing Lane - Arsene 115 kV — Transmission lineMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 1.8 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 2.3 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 3.5 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 3.7 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 3.9 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 5.7 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 6.2 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 6.7 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 6.7 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 6.8 mi awayBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 8.5 mi awaySolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 12.4 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 13.0 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 13.0 mi awaySalt Cod BESS — Filed · Storage · MA · 168 MW · 13.6 mi awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 14.3 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Wing Lane - Arsene 115 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-MA
Owner (as stated)
Nstar Electric

Details

Who’s behind it

Owner
Nstar Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Wing Lane to Arsene
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnstar electric
HIFLD line ID121146
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MA Acushnet 540R Main St Filed Solar + storage 1.8 mi 6
Randall Lane Solar Under construction Solar + storage 2.3 mi 10
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 3.5 mi 4.5
Clems Way Solar Permitted Solar 3.7 mi 5
Cushman Road Solar Filed Solar + storage 3.9 mi 6
Featherbed Lane South Solar Under construction Solar + storage 5.7 mi 2
Snipatuit Road Solar Under construction Solar + storage 6.2 mi 8
Logging Swamp South Permitted Solar 6.7 mi 5
Logging Swamp North Permitted Solar 6.7 mi 5
Braley Hill North Solar Under construction Solar + storage 6.8 mi 10
Borrego - Highland Ave Under construction Solar + storage 8.5 mi 10
Solar Carver 1 Hybrid Under construction Solar + storage 12.4 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 13.0 mi 2
CONGRUITY 360 LLC Built Large load 13.0 mi
Salt Cod BESS Filed Storage 13.6 mi 168
Tiverton Power Plant Postponed Gas, combined cycle 14.3 mi 289.8

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution