Woodbridge Energy Center: location and 20 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Woodbridge Energy Center
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 57% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2015
- Net generation, 2025
- 3,827,841 MWh
- Grid
- 230 kV to Jersey Central Power & Lt Co (PJM)
- Location
- Middlesex County, New Jersey
- Operated by
- Woodbridge Energy Center
Output
- Gas
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 11 years since 2015
- Unused energy
- 2,943 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,009 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 26,829,827 |
| Capacity factor, 2025 | 0.565 |
| Heat rate (Btu/kWh), 2025 | 7,009.1 |
| Net generation (MWh), 2025 | 3,827,841 |
| Balancing authority code | PJM |
Ownership
5 companies5| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| JOHN HANCOCK MANULIFE | Owner | 11.2% | Dec 31, 2023 | EPA GHGRP |
| OSAKA GAS USA CORP | Owner | 20.0% | Dec 31, 2023 | EPA GHGRP |
| TOYOTA TSUSHO POWER USA INC | Owner | 31.2% | Dec 31, 2023 | EPA GHGRP |
| CPV POWER HOLDINGS LP | Owner | 37.5% | Dec 31, 2023 | EPA GHGRP |
| Woodbridge Energy Center | Operator | EIA-860M |
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Middlesex Energy Center LLC Postponed | Gas, combined cycle | 5.2 mi | 570 |
| Gateway Energy Center, LLC Postponed | Gas, combined cycle | 5.2 mi | 440 |
| Milltown Onsite BESS Under construction | Storage | 7.4 mi | 13.2 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 7.8 mi | |
| EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built | Large load | 7.9 mi | |
| Elevate Arthur Kill Under construction | Storage | 8.2 mi | 15.1 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 9.0 mi | |
| Swiftsure Postponed | Storage | 9.0 mi | 121 |
| NJ 1 DATA CENTER Built | Large load | 9.2 mi | |
| Prologis - SLCNJ001 - Community Solar Under construction | Solar | 9.9 mi | 3.2 |
| Coreweave Under construction | Large load | 11.3 mi | |
| FIDESSA Built | Large load | 11.6 mi | |
| MORGAN STANLEY DATA CENTER Built | Large load | 11.9 mi | |
| BPL NJ - Belmont Under construction | Solar | 11.9 mi | 1.8 |
| BPL NJ - Union Distribution Center Under construction | Solar | 12.3 mi | 1.5 |
| Prologis - SLNNJ036 - Community Solar Under construction | Solar | 13.0 mi | 1.6 |
| Elizabeth Metropolitan Logistics Center Under construction | Solar | 13.1 mi | 1.2 |
| Staten Island Energy Storage 1 LLC Postponed | Storage | 13.7 mi | 5 |
| BLOOMBERG DATA CENTER Built | Large load | 14.2 mi | |
| AB Newark Solar Postponed | Solar | 14.3 mi | 5.6 |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES