Yucca: location and 1 exact-grade project within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Yucca
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 5% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1959
- Net generation, 2025
- 200,127 MWh
- Grid
- 69 kV to Arizona Public Service Co (AZPS)
- Location
- Yuma County, Arizona
- Operated by
- Arizona Public Service Co
Output
- Gas
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 67 years since 1959
- Unused energy
- 3,500 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 11,769 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 2,355,337 |
| Capacity factor, 2025 | 0.054 |
| Heat rate (Btu/kWh), 2025 | 11,769.2 |
| Net generation (MWh), 2025 | 200,127.0 |
| Balancing authority code | AZPS |
Ownership
3 companies4| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Arizona Public Service Co | Operator | EIA-860M | ||
| PINNACLE WEST CAPITAL CORP | Owner | 71.0% | Dec 31, 2023 | EPA GHGRP |
| Imperial Irrigation District | Owner | 29.0% | Dec 31, 2023 | EPA GHGRP |
| Imperial Irrigation District | Owner | 26.5% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Pioneer Clean Energy Center Under construction | Solar + storage | 21.9 km | 600 |
Sources EIA-860M