Douglas — Power plant · Oil · Arizona Public Service CoSaguaro — Power plant · Gas, combustion turbine · Arizona Public Service CoOcotillo — Power plant · Gas, combustion turbine · Arizona Public Service CoWest Phoenix — Power plant · Gas, combined cycle · Arizona Public Service CoYucca — Power plant · Gas, combustion turbine · Arizona Public Service CoFour Corners — Power plant · Coal · Arizona Public Service CoPalo Verde — Power plant · Nuclear · Arizona Public Service CoRed Hawk — Power plant · Gas, combined cycle · Arizona Public Service CoSundance — Power plant · Gas, combustion turbine · Arizona Public Service CoPrescott Airport — Power plant · Solar · Arizona Public Service CoLuke Solar — Power plant · Solar · Arizona Public Service CoPaloma Solar Hybrid — Power plant · Storage · Arizona Public Service CoCotton Center Solar Hybrid — Power plant · Storage · Arizona Public Service CoHyder Solar Hybrid — Power plant · Solar · Arizona Public Service CoChino Valley Solar — Power plant · Storage · Arizona Public Service CoFoothills Solar Plant Hybrid — Power plant · Solar · Arizona Public Service CoHyder II Hybrid — Power plant · Storage · Arizona Public Service CoGila Bend Hybrid — Power plant · Solar · Arizona Public Service CoDesert Star Hybrid — Power plant · Storage · Arizona Public Service CoRed Rock — Power plant · Solar · Arizona Public Service CoAgave — Power plant · Solar · Arizona Public Service CoCholla — Power plant · Coal · Arizona Public Service CoNavajo — Power plant · Coal · Salt River ProjectPunkin Center Battery Storage — Power plant · Storage · Arizona Public Service CoChilds — Power plant · Hydro · Arizona Public Service CoIrving — Power plant · Hydro · Arizona Public Service CoRed Hawk — Under construction · Under construction · Gas, combustion turbine · AZ · 392 MWAgave — Under construction · Under construction · Storage · AZ · 150 MWIronwood Solar — Under construction · Under construction · Solar + storage · AZ · 250 MWAgave — Under construction · Storage · AZ · 150 MW · 0.0 mi awayRed Hawk — Under construction · Gas, combustion turbine · AZ · 392 MW · 0.0 mi awayPrescott Airport — Postponed · Solar · AZ · 7 MW · 0.0 mi awayNTEC Gas Plant — Filed · Gas, combustion turbine · NM · 1,089 MW · 1.8 mi awayAligned Phx 7 — Filed · Large load · AZ · 2.5 mi awayMERIT 2 — Built · Large load · AZ · 2.7 mi awayQTS DC13 - Temp Crane - NE — Filed · Large load · AZ · 2.9 mi awayQTS PHX3 Data Center — Built · Large load · AZ · 3.2 mi awayMicrosoft Phx 83 (El Mirage data centre) — Filed · Large load · AZ · 3.2 mi awayAMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 — Under construction · Large load · AZ · 3.3 mi awayMICROSOFT CORP - OLIVE AVE — Built · Large load · AZ · 3.6 mi awayWhite Tank Energy Storage — Under construction · Storage · AZ · 100 MW · 4.1 mi awayPHX 70 - MICROSOFT DATA CENTER — Built · Large load · AZ · 4.1 mi awayPHX73 (Goodyear data centre) — Filed · Large load · AZ · 4.3 mi awayIron Mountain Data Center — Under construction · Large load · AZ · 4.3 mi awayPHOENIX DATA CENTER — Built · Large load · AZ · 4.4 mi awayCompass Datacenter — Under construction · Large load · AZ · 4.4 mi awayMICROSOFT CORP - CITRUS RD — Built · Large load · AZ · 4.5 mi awayCoolidge Generation Station — Under construction · Gas, combustion turbine · AZ · 297 MW · 5.1 mi awayGila Bend Power Generation Station — Postponed · Gas, combined cycle · AZ · 900 MW · 5.1 mi awayVantage AZ15 — Under construction · Large load · AZ · 5.4 mi awayStack Data Center — Filed · Large load · AZ · 5.5 mi awayMCDOWELL ROAD DATA CENTER — Built · Large load · AZ · 5.6 mi awayQTS 40th Street — Filed · Large load · AZ · 5.7 mi awayCOMPASS DATACENTERS PHX I — Built · Large load · AZ · 5.8 mi awayClean Path Energy Center — Postponed · Gas, combined cycle · NM · 735 MW · 5.9 mi awayCOMPASS DATA CENTER - MOONRAKER — Built · Large load · AZ · 5.9 mi awayBuckeye Generation Center, LLC — Postponed · Gas, combustion turbine · AZ · 652.2 MW · 6.2 mi awaySelma Energy Center — Under construction · Solar + storage · AZ · 275 MW · 6.6 mi awayQTS DATA CENTER — Under construction · Large load · AZ · 7.1 mi awayCrane (Avondale data centre) — Filed · Large load · AZ · 7.7 mi awayPHX16 Data Center — Filed · Large load · AZ · 7.7 mi awayValley Farms Energy Center — Under construction · Storage · AZ · 400 MW · 7.8 mi awayStream Data Center — Built · Large load · AZ · 7.8 mi awayPinon Energy Center — Postponed · Gas, combustion turbine · NM · 292.6 MW · 7.9 mi awayVantage Data Center 21 — Under construction · Large load · AZ · 8.4 mi awayRockmont Solar and Storage Project — Filed · Solar + storage · NM · 130 MW · 8.4 mi awayThistle Data Center Crane — Filed · Large load · AZ · 8.7 mi awayCPUS WEST FRYE ROAD, LP — Built · Large load · AZ · 8.7 mi awaySierra Luna Energy Storage — Announced · Storage · AZ · 150 MW · 8.7 mi awayPrime Data Center — Under construction · Large load · AZ · 8.8 mi awayAgua Caliente Solar Project — Postponed · Solar · AZ · 290 MW · 9.1 mi awayElisabeth Solar — Filed · Solar · AZ · 350 MW · 9.9 mi awayWestside - (NM) — Under construction · Gas, reciprocating engine · NM · 60 MW · 10.2 mi awayDIGITAL REALTY TRUST CHANDLER — Built · Large load · AZ · 10.3 mi awayCYRUSONE - CHANDLER — Built · Large load · AZ · 10.3 mi awayALIGNED PHX-04 DATA CENTER — Under construction · Large load · AZ · 10.6 mi awaySnowflake A Solar and BESS — Filed · Solar + storage · AZ · 950 MW · 10.9 mi awayPHX06 Data Center — Filed · Large load · AZ · 10.9 mi awayRomero Energy Center — Under construction · Storage · AZ · 225 MW · 11.9 mi away
  • Combustion
  • Clean firm
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Arizona Public Service Co

Show on map

Follow this company

Utility

Key facts

Utility
Capacity held
14,453.6MW
Assets
26
States
AZ, NM
Headquarters
Phoenix, United States Source: Wikidata
LEI
YG6VT0TPHRH4TFVAQV64 Source: Wikidata
Parent
PINNACLE WEST CAPITAL CORPOwnership claimOwnership link recorded from its source; no date stated by the source.

Gross output of plants with a stake

18 of 19 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 18 of 19 plants with a stake: US plants with an EIA monthly series.under 1% of the output is from 15 plants recorded as wholly owned.15 plants: operator, wholly owned per EIA-860.Not included: 7 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Coal
  • Oil
  • Nuclear
  • Hydro
  • Solar
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearCoalOilNuclearHydroSolarStorageTotal (MWh)
2026 (part year)6,014,104—21,509,334—327,693—27,851,131
20258,239,23321831,321,808—597,141142,29740,300,697
20248,493,4249332,388,118—442,633171,07041,495,338
20237,434,9119031,522,590—283,138166,62339,407,352
202210,310,2654831,942,793—376,843181,99642,811,945
20217,904,3576231,629,862—394,660196,88440,125,825
20207,598,9732331,552,433—359,838198,89739,710,164
201918,866,9025931,920,368—379,640190,02951,356,998
201820,526,28214131,097,259—352,566185,98352,162,231
201720,303,87729232,340,138—353,520166,59753,164,424
201618,931,8688432,377,477—245,977168,41751,723,823
201523,745,01239732,525,595—262,018187,17456,720,196
201426,026,42028932,320,917—191,316173,85758,712,799
201329,401,03416331,431,080—107,222140,05061,079,549
201229,629,45313131,933,916—44,45395,30761,703,260
201131,006,23128631,277,863—6,42423,75362,314,557
201030,334,39735931,199,935—5,561—61,540,252
200931,780,1845630,661,851—6,304—62,448,395
200832,206,68761829,250,496—6,387—61,464,188
200732,213,64613526,782,391—6,701—59,002,873
200633,508,0075924,012,231—6,337—57,526,634
200532,646,71422725,807,446—5,053—58,459,440
200432,721,41132128,112,60929,2823,968—60,867,591
200332,003,86916828,581,05329,824——60,614,914
200230,746,3721,07430,861,91128,702——61,638,059
200132,447,33220,37328,724,07632,341——61,224,122

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 26

Assets

26

Capacity

14,454 MW

MW by fuel
  1. Coal: 5,174 MW, 3 assets
  2. Nuclear: 4,210 MW, 1 asset
  3. Gas, combined cycle: 2,334 MW, 2 assets
  4. Gas, combustion turbine: 2,108 MW, 4 assets
  5. Solar: 438 MW, 7 assets
  6. Other: 189 MW, 9 assets

Operates 25 power plants · Owns 3 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Palo Verde Nuclear Operates and owns 4,209.6 MW US-AZ 29.1% Arizona Public Service Co
Navajo Coal Owns 2,409.3 MW US-AZ 14.0% Arizona Public Service Co
Four Corners Coal Operates and owns 1,636.2 MW US-NM 63.0% Arizona Public Service Co
West Phoenix Gas, combined cycle Operates 1,207.4 MW US-AZ — Arizona Public Service Co
Cholla Coal Operates 1,128.8 MW US-AZ — Arizona Public Service Co
Red Hawk Gas, combined cycle Operates 1,127 MW US-AZ — Arizona Public Service Co
Ocotillo Gas, combustion turbine Operates 806.2 MW US-AZ — Arizona Public Service Co
Sundance Gas, combustion turbine Operates 695 MW US-AZ — Arizona Public Service Co
Yucca Gas, combustion turbine Operates 422.4 MW US-AZ — Arizona Public Service Co
Saguaro Gas, combustion turbine Operates 184.5 MW US-AZ — Arizona Public Service Co
Agave Solar Operates 150 MW US-AZ — Arizona Public Service Co
Red Rock Solar Operates 84.9 MW US-AZ — Arizona Public Service Co
Foothills Solar Plant Hybrid Solar Operates 73 MW US-AZ — Arizona Public Service Co
Gila Bend Hybrid Solar Operates 68 MW US-AZ — Arizona Public Service Co
Hyder Solar Hybrid Solar Operates 48 MW US-AZ — Arizona Public Service Co
Chino Valley Solar Storage Operates 38 MW US-AZ — Arizona Public Service Co
Paloma Solar Hybrid Storage Operates 34 MW US-AZ — Arizona Public Service Co
Cotton Center Solar Hybrid Storage Operates 34 MW US-AZ — Arizona Public Service Co
Hyder II Hybrid Storage Operates 28 MW US-AZ — Arizona Public Service Co
Douglas Oil Operates 26.1 MW US-AZ — Arizona Public Service Co
Desert Star Hybrid Storage Operates 20 MW US-AZ — Arizona Public Service Co
Luke Solar Solar Operates 11.2 MW US-AZ — Arizona Public Service Co
Childs Hydro Operates 5.4 MW US-AZ — Arizona Public Service Co
Prescott Airport Solar Operates 3 MW US-AZ — Arizona Public Service Co
Punkin Center Battery Storage Storage Operates 2 MW US-AZ — Arizona Public Service Co
Irving Hydro Operates 1.6 MW US-AZ — Arizona Public Service Co

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 59

within 15 mi

Projects

59

within 15 mi

Nearest

0.0 mi

Agave

All 59NearbyShowing all 59 nearby projects. The 50 nearest are listed.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first: 50 rows for the nearest of 59.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Agave Storage 150 MW 0.0 mi away nearest: Agave
Under construction Red Hawk Gas, combustion turbine 392 MW 0.0 mi away nearest: Red Hawk
Postponed Prescott Airport Solar 7 MW 0.0 mi away nearest: Prescott Airport
Filed NTEC Gas Plant Gas, combustion turbine 1,089 MW 1.8 mi away nearest: Four Corners
Filed Aligned Phx 7 Large load — 2.5 mi away nearest: Luke Solar
Built Merit 2 Large load — 2.7 mi away nearest: Luke Solar
Filed QTS DC13 - Temp Crane - NE Large load — 2.9 mi away nearest: Luke Solar
Built QTS PHX3 Data Center Large load — 3.2 mi away nearest: Luke Solar
Filed Microsoft Phx 83 (El Mirage data centre) Large load — 3.2 mi away nearest: Luke Solar
Under construction American Airlines - PHX Data Center BLDG 1920 Large load — 3.3 mi away nearest: Ocotillo
Built Microsoft Corp - Olive Ave Large load — 3.6 mi away nearest: Luke Solar
Under construction White Tank Energy Storage Storage 100 MW 4.1 mi away nearest: Luke Solar
Built PHX 70 - Microsoft Data Center Large load — 4.1 mi away nearest: Luke Solar
Filed PHX73 (Goodyear data centre) Large load — 4.3 mi away nearest: Luke Solar
Under construction Iron Mountain Data Center Large load — 4.3 mi away nearest: Ocotillo
Built Phoenix Data Center Large load — 4.4 mi away nearest: Ocotillo
Under construction Compass Datacenter Large load — 4.4 mi away nearest: Luke Solar
Built Microsoft Corp - Citrus RD Large load — 4.5 mi away nearest: Luke Solar
Under construction Coolidge Generation Station Gas, combustion turbine 297 MW 5.1 mi away nearest: Sundance
Postponed Gila Bend Power Generation Station Gas, combined cycle 900 MW 5.1 mi away nearest: Gila Bend Hybrid
Under construction Vantage AZ15 Large load — 5.4 mi away nearest: Luke Solar
Filed Stack Data Center Large load — 5.5 mi away nearest: Ocotillo
Built Mcdowell Road Data Center Large load — 5.6 mi away nearest: Ocotillo
Filed QTS 40th Street Large load — 5.7 mi away nearest: Ocotillo
Built Compass Datacenters PHX I Large load — 5.8 mi away nearest: Luke Solar
Postponed Clean Path Energy Center Gas, combined cycle 735 MW 5.9 mi away nearest: Four Corners
Built Compass Data Center - Moonraker Large load — 5.9 mi away nearest: Luke Solar
Postponed Buckeye Generation Center, LLC Gas, combustion turbine 652.2 MW 6.2 mi away nearest: Desert Star Hybrid
Under construction Selma Energy Center Solar + storage 275 MW 6.6 mi away nearest: Sundance
Under construction QTS Data Center Large load — 7.1 mi away nearest: Luke Solar
Filed Crane (Avondale data centre) Large load — 7.7 mi away nearest: Luke Solar
Filed PHX16 Data Center Large load — 7.7 mi away nearest: Luke Solar
Under construction Valley Farms Energy Center Storage 400 MW 7.8 mi away nearest: Sundance
Built Stream Data Center Large load — 7.8 mi away nearest: Luke Solar
Postponed Pinon Energy Center Gas, combustion turbine 292.6 MW 7.9 mi away nearest: Four Corners
Under construction Vantage Data Center 21 Large load — 8.4 mi away nearest: Luke Solar
Filed Rockmont Solar and Storage Project Solar + storage 130 MW 8.4 mi away nearest: Four Corners
Filed Thistle Data Center Crane Large load — 8.7 mi away nearest: Ocotillo
Built CPUS West FRYE Road, LP Large load — 8.7 mi away nearest: Ocotillo
Announced Sierra Luna Energy Storage Storage 150 MW 8.7 mi away nearest: West Phoenix
Under construction Prime Data Center Large load — 8.8 mi away nearest: Luke Solar
Postponed Agua Caliente Solar Project Solar 290 MW 9.1 mi away nearest: Hyder II Hybrid
Filed Elisabeth Solar Solar 350 MW 9.9 mi away nearest: Hyder II Hybrid
Under construction Westside - (NM) Gas, reciprocating engine 60 MW 10.2 mi away nearest: Four Corners
Built Digital Realty Trust Chandler Large load — 10.3 mi away nearest: Ocotillo
Built Cyrusone - Chandler Large load — 10.3 mi away nearest: Ocotillo
Under construction Aligned PHX-04 Data Center Large load — 10.6 mi away nearest: Ocotillo
Filed Snowflake A Solar and BESS Solar + storage 950 MW 10.9 mi away nearest: Cholla
Filed PHX06 Data Center Large load — 10.9 mi away nearest: Ocotillo
Under construction Romero Energy Center Storage 225 MW 11.9 mi away nearest: Palo Verde

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Every source and license · Attribution