Methodology

Source dates, gaps and terms.

About this

What a record page cannot say: how old a source’s data is, which gaps mean no source rather than no activity, and what the words mean.

Some sources here allow noncommercial use only. Each is credited on its records, and it comes off the site if we stop publishing it.

What is not here

Empty here means no source, not nothing happening.

What is not here

239 sources are registered and 53 have rows flowing. The register holds 73,326 projects, 5,243 RFPs and funding notices and 162,260 existing assets. An empty result for anything below means we have no source, not that nothing is happening.

Technologies with no rows

Our classifier can produce these, and no loaded source ever has: Fuel cell.

Registers we hold but do not publish

Nothing from these appears on this site. 5 of the 50 are interconnection or connection registers, the absence you would feel on the map.

RegisterWhereWhy nothing is shown
EirGrid / ESB Networks connection lists (ECP batches) · connection register IE terms require a license or consent we do not hold
BPA Interconnection Request Queue — line-and-load (LL) requests · connection register US held until a check recorded in the register is done
MISO Generator Interconnection Queue · connection register US-MISO terms require a license or consent we do not hold
PJM New Services Queue (Queue Point / Data Miner) · connection register US-PJM terms require a license or consent we do not hold
Non-ISO utility generator interconnection queues via OASIS / utility sites · connection register US (Duke, Southern, TVA, Dominion-non-PJM, PacifiCorp, APS, NV Energy, Xcel-CO, BPA, WAPA, etc.) terms not retrievable, so nothing is assumed
ENTSO-E Transparency Platform — day-ahead prices per bidding zone (Transparency Regulation Art. 12.1.d) EU terms require a license or consent we do not hold
ENTSO-E TYNDP 2026 project portfolio (199 transmission + 69 storage) EU terms require a license or consent we do not hold
EPEX SPOT day-ahead and intraday auction prices (including the GB auctions) EU/GB terms require a license or consent we do not hold
Nord Pool day-ahead and intraday auction prices (including N2EX, GB) EU/GB/Nordics terms require a license or consent we do not hold
Elexon Insights Solution (BMRS) — Market Index Data (MID) from the market index data providers GB terms require a license or consent we do not hold
India SECI (sole REIA from 2026) + MNRE tender pages IN terms require a license or consent we do not hold
African Development Bank — procurement notices global terms not retrievable, so nothing is assumed
EBRD — procurement notices global terms require a license or consent we do not hold
Inter-American Development Bank — procurement notices global terms not retrievable, so nothing is assumed
ADB, AfDB, EBRD (ECEPP), IDB, IFC, UNGM procurement & project pipelines global terms not retrievable, so nothing is assumed
UN Global Marketplace — procurement notices of UN organisations global terms require a license or consent we do not hold
World Bank Group (IFC) — project disclosures and procurement global terms require a license or consent we do not hold
Argonne National Laboratory Renewable Natural Gas Database (RNG projects: operational, under construction, planned; feedstock, end use, capacity) US terms not retrievable, so nothing is assumed
Arizona DEQ — UIC / Class VI programme US-AZ terms not retrievable, so nothing is assumed
DHS HIFLD — Electric Substations (restricted public) US terms require a license or consent we do not hold
EIA — oil and natural gas field outlines (year-end 2001 field maps) US terms not retrievable, so nothing is assumed
EIA wholesale electricity and natural gas market data (daily ICE next-day index prices at seven hubs) US terms require a license or consent we do not hold
Florida Department of Revenue statewide cadastral (67 county property appraisers), for the site finder's land parcels US-FL terms require a license or consent we do not hold
FracTracker Alliance — Open U.S. Data Centers Tracker (existing, permitted and proposed data centres) US terms require a license or consent we do not hold
Iowa Utilities Commission — Electronic Filing System (HLP hazardous-liquid pipeline dockets: Summit HLP-2021-0001, Navigator, Wolf) US-IA held until a check recorded in the register is done
Illinois DNR Office of Oil and Gas Resource Management — UIC programme (no data links on the landing page) US-IL terms require a license or consent we do not hold
Illinois Commerce Commission — carbon dioxide pipelines programme page and e-Docket (Navigator, Wolf, One Earth dockets) US-IL terms require a license or consent we do not hold
Indiana IDEM air permit public notices (draft permits, all regions) US-IN terms require a license or consent we do not hold
MISO locational marginal prices — day-ahead and real-time, commercial pricing nodes and hubs US-MISO terms require a license or consent we do not hold
PJM LMPs — day-ahead and real-time, pricing nodes, hubs and zones (Data Miner 2) US-PJM terms require a license or consent we do not hold
Granicus Legistar Web API — council and commission matters naming a data centre (per-client) US terms not retrievable, so nothing is assumed
Michigan Public Service Commission orders, notices and bulletins (case documents) US-MI terms require a license or consent we do not hold
Minnesota PUC eDockets (Summit Carbon Solutions Otter Tail-to-Wilkin route permit) US-MN terms not retrievable, so nothing is assumed
Municipal / state procurement aggregators (BidNet Direct, DemandStar, OpenGov, Periscope, state e-procurement portals) US terms require a license or consent we do not hold
North Dakota DMR Oil & Gas Division — well data (Basic and Premium services), hearing dockets, GIS map server US-ND terms require a license or consent we do not hold
NOAA Office for Coastal Management — Electric Power Substations (within 20 miles of the coast, 2017) US (coastal counties, continental US and Puerto Rico) terms require a license or consent we do not hold
Nevada NDEP Bureau of Air Pollution Control notices of proposed action (Class I and II operating permits) US-NV terms not retrievable, so nothing is assumed
Ohio Power Siting Board cases (letters of notification and applications naming a data-centre customer) US-OH terms not retrievable, so nothing is assumed
OpenStreetMap data-centre sites, US — land-use elements tagged or named as data centres, read from Overture Maps' base/land_use theme US held until a check recorded in the register is done
OurGridFuture planned transmission projects database (GIS shapefile) US terms not retrievable, so nothing is assumed
Overture Maps places, US — places whose name says data centre (operating listings) US held until a check recorded in the register is done
South Dakota PUC — Hydrocarbon and Carbon Dioxide Pipeline Dockets (HP dockets; Summit SCS Carbon Transport, Navigator Heartland Greenway) US-SD terms not retrievable, so nothing is assumed
State PUC docket systems (NY DMM, CPUC, PUCT Interchange, PA, OR, CO, etc.) US-states terms not retrievable, so nothing is assumed
State siting boards (NY ORES, OH OPSB, IL, MI PSC, MN PUC, WI PSC, CT Siting Council, MA EFSB, CA CEC Opt-in) US-states terms not retrievable, so nothing is assumed
TCEQ New Source Review air permits database US-TX held until a check recorded in the register is done
Utility / co-op / CCA all-source and renewable RFPs US terms not retrievable, so nothing is assumed
Prince William County data center campuses and buildings (Planning build-out analysis layers) US-VA terms require a license or consent we do not hold
West Virginia DEP — UIC programme (Class VI) US-WV terms require a license or consent we do not hold
Wyoming DEQ — UIC Class VI US-WY terms not retrievable, so nothing is assumed
South Africa IPP Office — REIPPPP / BESIPPPP bid windows ZA terms require a license or consent we do not hold

Ownership depth

48,119 of 50,272 companies have no recorded parent (2,153 do). A company page showing no parent is a company we have no parent record for.

Existing assets: sources per type

Each type is loaded one row per source record. Where a type has more than one source and nothing yet resolves them to one record per asset, a count over its rows can exceed the number of assets.

Asset typeRowsSourcesOne record per asset
Power plants 116,525 · 116,507 with a location Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) 81,231
GEM tracker rows sourced from TransitionZero (rows carrying a TZ ID), CC BY-NC 4.0 18,722
EIA-860M 16,572
Yes
Transmission lines 34,302 LBNL 13,084
OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts 21,218
Not yet
Substations 6,208 OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts 6,208 One source, so nothing to resolve
RNG projects 1,851 · 1,339 with a location EPA AgSTAR 498
EPA LMOP 1,353
Not yet: measured
Petroleum product terminals 1,474 EIA Energy Atlas 1,474 One source, so nothing to resolve
Gas processing plants 478 EIA Energy Atlas 478 One source, so nothing to resolve
Gas storage sites 412 EIA Energy Atlas 412 One source, so nothing to resolve
Gas pipelines 259 EIA Energy Atlas 259 One source, so nothing to resolve
Ethanol plants 204 · 197 with a location EIA Energy Atlas 197
EIA ethanol capacity 7
Yes
Refineries 130 EIA Energy Atlas 130 One source, so nothing to resolve
Crude oil pipelines 128 EIA Energy Atlas 128 One source, so nothing to resolve
Petroleum product pipelines 117 EIA Energy Atlas 117 One source, so nothing to resolve
Crude oil rail terminals 94 EIA Energy Atlas 94 One source, so nothing to resolve
HGL pipelines 70 EIA Energy Atlas 70 One source, so nothing to resolve
LNG terminals 8 EIA Energy Atlas 8 One source, so nothing to resolve

Status values no source produces

These words are in the vocabulary and no loaded source maps into them, so no record carries them today: Frozen, Reinstated, Cancelled. What each means.

Notes

5

ERCOT publishes no request-level large-load data, so no Texas large-load request is listed.

The data-centre sites on this register come from air-permit registers (Virginia DEQ and EPA ICIS-Air), carry no MW, and are not grid requests. ERCOT reports its large-load interconnection queue only as system-wide totals and charts in PDF decks, with no file that lists individual requests, their size, status or location. The ERCOT large-load connector watches ERCOT's data catalogue each month and has found no such file; until one appears, an empty Texas large-load view is a fact about what ERCOT publishes, not about Texas demand.

Written 2026-10-07. The numbers above it are measured on every page load; this paragraph is not.

Interconnection queues withheld pending licence clearance: PJM and MISO.

PJM and MISO rows are published nowhere, on any tier, because their terms do not let us republish them: they require a licence we do not hold, or grant a use this site is not operating under. No projects from these queues is a fact about our licences, not about the queues.

Written 2026-11-09. The numbers above it are measured on every page load; this paragraph is not.

Most companies have no recorded parent.

Ownership comes from GLEIF's Level 2 accounting-consolidation parents, which cover LEI-registered entities only, plus a small curated file of edges taken from companies' own published statements. A company shown with no parent is a company we have no parent *record* for; privately held and fund-owned operators are systematically the ones missing, which is the opposite of what an empty parent field looks like.

Written 2026-09-21. The numbers above it are measured on every page load; this paragraph is not.

Coverage is US-first, with three non-US feeds.

Supply coverage is three US interconnection queues plus the federal generator inventory and the GB transmission register. Demand coverage is EU, GB, US federal and multilateral-bank notices. There is no coverage of US state or local permitting, no non-GB European interconnection queue, and no Canadian, Australian or Asian supply source. Absence of a country here means we have not built it, never that nothing is happening there.

Written 2026-09-21. The numbers above it are measured on every page load; this paragraph is not.

RNG projects: two EPA sources, covering different populations.

The two sources are not resolved to one record per project either, but they do not need to be: LMOP lists landfill-gas projects and AgSTAR lists farm digesters, and no project was found in both (0 cross-source links, measured 2026-09-22, docs/24). A count over these rows is a count of projects. It is listed here because the table above cannot tell an overlap from a disjoint pair, and a reader should not have to guess which this is.

On this load: 1,851 rows from 2 sources, 1,339 with a location. This note is withdrawn automatically when the type has one source or a resolution exists.

Written 2026-09-25. The numbers above it are measured on every page load; this paragraph is not.