631-56 Airport Owner, LLC — Power plant · Wind · 631-56 Airport Owner, LLCSalt Cod BESS — Filed · Storage · MA · 168 MW · 1.7 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 3.5 mi awayBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 6.5 mi awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 7.7 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 11.2 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 11.5 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 11.5 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 12.1 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 12.2 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 12.3 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 12.4 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 12.5 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

631-56 Airport Owner, LLC

Show on map

Follow this company

Power plant owner

Key facts

Power plant ownerNo parent recordedLike 48,145 of 50,298 companies here. Why
Assets
1
States
MA
Registered in
United States

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2014 to 2024
  • Wind
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearWindTotal (MWh)
202400
202300
202200
20215454
2020416416
20191,9421,942
20182,9852,985
20171,5881,588
20161,4291,429
20152,7992,799
20142,9872,987

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

2.0 MW

MW by fuel
  1. Wind: 2.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 12

within 15 mi

Projects

12

within 15 mi

Nearest

1.7 mi

Salt Cod BESS

All 12NearbyShowing all 12 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed Salt Cod BESS Storage 168 MW 1.7 mi away nearest: 631-56 Airport Owner, LLC
Built Congruity 360 LLC Large load — 3.5 mi away nearest: 631-56 Airport Owner, LLC
Under construction Borrego - Highland Ave Solar + storage 10 MW 6.5 mi away nearest: 631-56 Airport Owner, LLC
Postponed Tiverton Power Plant Gas, combined cycle 289.8 MW 7.7 mi away nearest: 631-56 Airport Owner, LLC
Under construction Braley Hill North Solar Solar + storage 10 MW 11.2 mi away nearest: 631-56 Airport Owner, LLC
Under construction Featherbed Lane South Solar Solar + storage 2 MW 11.5 mi away nearest: 631-56 Airport Owner, LLC
Permitted Clems Way Solar Solar 5 MW 11.5 mi away nearest: 631-56 Airport Owner, LLC
Filed MA Acushnet 540R Main St Solar + storage 6 MW 12.1 mi away nearest: 631-56 Airport Owner, LLC
Under construction Snipatuit Road Solar Solar + storage 8 MW 12.2 mi away nearest: 631-56 Airport Owner, LLC
Permitted Logging Swamp North Solar 5 MW 12.3 mi away nearest: 631-56 Airport Owner, LLC
Permitted Logging Swamp South Solar 5 MW 12.4 mi away nearest: 631-56 Airport Owner, LLC
Filed Cushman Road Solar Solar + storage 6 MW 12.5 mi away nearest: 631-56 Airport Owner, LLC

Sources EIA-860M · EPA ICIS-Air

Sources

Every source and license · Attribution