Paline Pipeline — Crude oil pipeline · DELEK LOGISTICSSan Angelo Product Pipeline — Petroleum product pipeline · DELEK LOGISTICSMagnolia — Crude oil pipeline · DELEK LOGISTICSEl Dorado — Crude oil pipeline · DELEK LOGISTICSSALA — Crude oil pipeline · DELEK LOGISTICSOrange County Advanced Power Station — Under construction · Gas, combined cycle · TX · 1,306 MW · 6.0 mi awayLegend Power Station — Studied · Gas, other · TX · 820 MW · 7.7 mi awayPinecrest Energy Center — Postponed · Gas, combined cycle · TX · 753 MW · 9.3 mi awayNacogdoches Power — Postponed · Gas, combined cycle · TX · 925 MW · 9.5 mi awayAmelia Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 13.4 mi away
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Delek Logistics

Follow this company

Crude oil pipeline operator and Petroleum product pipeline operator

As filed: DELEK LOGISTICS

Key facts

Crude oil pipeline operator and Petroleum product pipeline operator · 382 miles
Pipeline and line held
382miles
Assets
5
States
AR, LA, TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Assets 5

Assets

5

2 kinds

Assets by type
  1. Crude oil pipeline: 4 assets, 4 assets
  2. Petroleum product pipeline: 1 assets, 1 asset

Operates 4 crude oil pipelines · Operates 1 petroleum product pipeline

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z Miles. Sort by length, largest first State. Sort by state, A to Z Held by
Paline Pipeline Crude oil pipeline Operates 183 miles US-TX DELEK LOGISTICS
Magnolia Crude oil pipeline Operates 76 miles US-AR, US-LA DELEK LOGISTICS
SALA Crude oil pipeline Operates 12 miles US-AR DELEK LOGISTICS
El Dorado Crude oil pipeline Operates 29 miles US-AR DELEK LOGISTICS
San Angelo Product Pipeline Petroleum product pipeline Operates 83 miles US-TX DELEK LOGISTICS

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 9, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

of 21 before the technology filter

Nearest

6.0 mi

Orange County Advanced Power Station

5 of 21 · gas, oil and hydrogen technologiesNearbyShowing 5 of 21 nearby projects, narrowed to gas, oil and hydrogen technologies because this company operates oil or liquids infrastructure. Show all 21

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Orange County Advanced Power Station Gas, combined cycle 1,306 MW 6.0 mi away nearest: Paline Pipeline
Studied Legend Power Station Gas, other 820 MW 7.7 mi away nearest: Paline Pipeline
Postponed Pinecrest Energy Center Gas, combined cycle 753 MW 9.3 mi away nearest: Paline Pipeline
Postponed Nacogdoches Power Gas, combined cycle 925 MW 9.5 mi away nearest: Paline Pipeline
Postponed Amelia Energy Center Gas, combined cycle 900 MW 13.4 mi away nearest: Paline Pipeline

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Every source and license · Attribution