Desert Peak Energy Storage II — Power plant · Storage · Desert Peak Energy Storage II, LLCPainted Hills — Postponed · Wind · CA · 17.5 MW · 2.5 mi awayPainted Hills IV Wind — Withdrawn · Wind · CA · 19.5 MW · 2.6 mi awayWestwind Trust — Postponed · Wind · CA · 15.6 MW · 3.3 mi awaySolar Photovoltaic Project #45 — Postponed · Solar · CA · 6 MW · 4.4 mi awayAlta Mesa Project Phase IV — Postponed · Wind · CA · 40 MW · 5.3 mi away
  • Storage
  • Operating
  • 10 · 100 · 1,000 MW

Desert Peak Energy Storage II, LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 75 MW
Assets
1
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2023 to 2026
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearStorageTotal (MWh)
2026 (part year)-9,774-9,774
2025-13,179-13,179
2024-9,495-9,495
2023 (part year)-1,430-1,430

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 1

Assets

1

Capacity

75.0 MW

MW by fuel
  1. Storage: 75.0 MW, 1 asset

Operates 1 power plant

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 5

within 15 mi

Projects

5

within 15 mi

Nearest

2.5 mi

Painted Hills

All 5NearbyShowing all 5 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Painted Hills Wind 17.5 MW 2.5 mi away nearest: Desert Peak Energy Storage II
Withdrawn Painted Hills IV Wind Wind 19.5 MW 2.6 mi away nearest: Desert Peak Energy Storage II
Postponed Westwind Trust Wind 15.6 MW 3.3 mi away nearest: Desert Peak Energy Storage II
Postponed Solar Photovoltaic Project #45 Solar 6 MW 4.4 mi away nearest: Desert Peak Energy Storage II
Postponed Alta Mesa Project Phase IV Wind 40 MW 5.3 mi away nearest: Desert Peak Energy Storage II

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO

Every source and license · Attribution