Sabine River Operations — Power plant · Gas, combined cycle · The Dow Chemical CompanyDow St Charles Operations — Power plant · Gas, combined cycle · Dow Chemical Co - St CharlesUnion Carbide Seadrift Cogen — Power plant · Gas, combustion turbine · Union Carbide Corp-SeadriftTexas City Plant Union Carbide — Power plant · Other · Union Carbide Corp-Texas CityPlaquemine Cogeneration Plant — Power plant · Gas, combined cycle · Dow Chemical CoLaO Energy Systems — Power plant · Gas, combined cycle · Dow Chemical CoUnion Carbide South Charleston — Power plant · Gas, steam turbine · Union Carbide C&P-CharlestonPittsburg Power Plant — Power plant · Gas, combustion turbine · The Dow Chemical CompanyPlaquemine Operations — Power plant · Gas, combined cycle · Dow Chemical CoStratton Ridge — Gas storage site · Salt dome · DOW CHEMICAL COMPANYDow Chemical Company substation (OSM way 522624206) — SubstationElsta power station — Power plant · Gas, combined cycleZeya — Under construction · Storage · TX · 255.3 MW · 0.9 mi awayWaterford 5 — Permitted · Gas, other · LA · 478 MW · 2.7 mi awayWaterford 6 — Announced · Gas, combined cycle · LA · 820 MW · 2.7 mi awayFreeport Energy Center — Postponed · Gas, combined cycle · TX · 180 MW · 3.3 mi awayRed Egret — Under construction · Storage · TX · 310.6 MW · 4.8 mi awayVertus Energy Storage Plant — Studied · Storage · TX · 204.9 MW · 5.7 mi awayCypress Harvest Solar Station — Announced · Solar + storage · LA · 400 MW · 5.9 mi awayBrazoria Solar I — Under construction · Solar · TX · 250 MW · 6.9 mi awayOrange County Advanced Power Station — Under construction · Gas, combined cycle · TX · 1,306 MW · 7.1 mi awayBorssele nuclear power plant 2 — Announced · Nuclear · Netherlands · 1,650 MW · 11.7 km awayBorssele nuclear power plant 3 — Announced · Nuclear · Netherlands · 1,650 MW · 11.7 km awayHidden Lakes — Postponed · Storage · TX · 9.9 MW · 9.6 mi awayBerkman Storage — Postponed · Storage · TX · 100 MW · 11.9 mi awayWindmill Ridge Storage — Postponed · Storage · TX · 151.4 MW · 12.7 mi awayMyrtle Solar, LLC — Under construction · Solar · TX · 313 MW · 13.5 mi awayWillow Beach Wind — Contracted · Wind · TX · 202.3 MW · 14.3 mi away
  • Combustion
  • Unspecified fuel
  • Operating
  • Retired
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Power plant owner and Gas storage operator

As filed: DOW INC

Key facts

Power plant owner and Gas storage operator · 3,557.6 MW
Capacity held
3,557.6MW
Assets
12
States
CA, LA, TX, WV
Companies below
2
Headquarters
Midland, United States Source: Wikidata
Listed
NYSE: DOW Source: SEC EDGAR
LEI
5493003S21INSLK2IP73 Source: Wikidata
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

9 of 10 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 9 of 10 plants with a stake: US plants with an EIA monthly series.100% of the output is from 9 plants recorded as wholly owned.3 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Gas
  • Unspecified fuel
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasUnspecified fuelTotal (MWh)
2026 (part year)6,282,64480,5326,363,176
202511,082,53182,81011,165,341
202411,465,94850,09911,516,047
202311,527,82773,89911,601,726
202212,478,25458,60712,536,861
202112,395,03967,97112,463,010
202012,140,48957,85612,198,345
201912,892,60770,34612,962,953
201812,001,01851,43912,052,457
201711,773,17281,37011,854,542
201612,546,262108,62912,654,891
201511,133,39781,83311,215,230
20149,428,32576,9009,505,224
201310,448,24294,07110,542,313
201210,126,51697,78710,224,302
201110,081,68398,05410,179,737
20109,732,433155,6569,888,089
20098,662,008258,8318,920,838
20088,802,526246,8749,049,400
20079,692,726186,0639,878,789
200610,562,327187,35610,749,683
20059,859,579167,75610,027,335
20047,072,159244,3187,316,477
20033,594,372104,0163,698,388
20028,070,501415,3198,485,820
20017,966,333452,0348,418,367

Sources GEM · EIA-860 · EIA-860M · EIA · EPA GHGRP

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Sources 6

Registers

6

Reuse terms

  • 4 Open license
  • 2 Open license, with credit

Latest read

2026-11-13

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • EIA Energy Atlas ·

    EIA US Energy Atlas — Natural Gas Underground Storage (fields; operator, working gas capacity, field type)

    Open license · retrieved Nov 13, 2026

    US federal work — public domain; EIA reuse statement quoted in docs/13 section 2.11. Dataset-level licenseInfo not retrieved by script; read in a browser before the layer ships

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • EIA-860M ·

    EIA-860M Preliminary Monthly Electric Generator Inventory

    Open license · retrieved Nov 4, 2026

    US federal work — public domain

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • OpenStreetMap ·

    OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts

    Open license, with credit · retrieved Oct 10, 2026

    Open Database License 1.0. OpenStreetMap copyright page https://www.openstreetmap.org/copyright (retrieved 2026-10-22T13:51Z, HTTP 200, platform user-agent; /copyright is not disallowed by robots.txt): "OpenStreetMap is open data, licensed under the Open Data Commons Open Database License (ODbL) by the OpenStreetMap Foundation (OSMF)." "You are free to copy, distribute, transmit and adapt our data, as long as you credit OpenStreetMap and its contributors. If you alter or build upon our data, you may distribute the result only under the same license." "Where you use OpenStreetMap data, you are required to do the following two things: Provide credit to OpenStreetMap by displaying our attribution notice. Make clear that the data is available under the Open Database License." "If you are distributing OSM in data form, please name and link directly to the license(s)." Geofabrik, https://www.geofabrik.de/data/download.html (retrieved 2026-10-22T13:38Z, HTTP 200), on its download server: "All OpenStreetMap derived data on the download server is licensed under the Open Database License 1.0 . You may use the data for any purpose, but you have to acknowledge OpenStreetMap as the data source. Derived databases have to retain the same license." and "The raw data files ( .osm.pbf , .osc.gz , .osm.bz2 ) on our public download server ( download.geofabrik.de ) do not contain these fields" (user name, user id, changeset id). ODbL 1.0 sections 4.4 (share alike) and 4.6 (access to derivative databases) are quoted in docs/13 section 2.10.

    Summary only: the source’s license keeps the full record at the source.

    View at source →

    © OpenStreetMap contributors · license

  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • SEC EDGAR ·

    SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)

    Open license · retrieved Nov 4, 2026

    Source: U.S. Securities and Exchange Commission, EDGAR · license

    SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 16

within 15 mi (25 km outside the US)

Projects

16

within 15 mi (25 km outside the US)

Nearest

0.9 mi

Zeya

All 16NearbyShowing all 16 nearby projects.

How these are matched

Exact-grade projects within 15 mi (25 km outside the US) of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi (25 km outside the US) of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Under construction Zeya Storage 255.3 MW 0.9 mi away nearest: Texas City Plant Union Carbide
Permitted Waterford 5 Gas, other 478 MW 2.7 mi away nearest: Dow St Charles Operations
Announced Waterford 6 Gas, combined cycle 820 MW 2.7 mi away nearest: Dow St Charles Operations
Postponed Freeport Energy Center Gas, combined cycle 180 MW 3.3 mi away nearest: Dow Chemical Company substation (OSM way 522624206)
Under construction Red Egret Storage 310.6 MW 4.8 mi away nearest: Texas City Plant Union Carbide
Studied Vertus Energy Storage Plant Storage 204.9 MW 5.7 mi away nearest: Texas City Plant Union Carbide
Announced Cypress Harvest Solar Station Solar + storage 400 MW 5.9 mi away nearest: LaO Energy Systems
Under construction Brazoria Solar I Solar 250 MW 6.9 mi away nearest: Stratton Ridge
Under construction Orange County Advanced Power Station Gas, combined cycle 1,306 MW 7.1 mi away nearest: Sabine River Operations
Announced Borssele nuclear power plant 2 Nuclear 1,650 MW 11.7 km away nearest: Elsta power station
Announced Borssele nuclear power plant 3 Nuclear 1,650 MW 11.7 km away nearest: Elsta power station
Postponed Hidden Lakes Storage 9.9 MW 9.6 mi away nearest: Texas City Plant Union Carbide
Postponed Berkman Storage Storage 100 MW 11.9 mi away nearest: Texas City Plant Union Carbide
Postponed Windmill Ridge Storage Storage 151.4 MW 12.7 mi away nearest: Stratton Ridge
Under construction Myrtle Solar, LLC Solar 313 MW 13.5 mi away nearest: Stratton Ridge
Contracted Willow Beach Wind Wind 202.3 MW 14.3 mi away nearest: Texas City Plant Union Carbide

Sources ERCOT · EIA-860M · Berkeley Lab · GEM

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution