Castrum 13 solar farm — Power plant · SolarTuscia 21 solar farm — Power plant · SolarMontalto di Castro nuclear power plant 2 — Cancelled · Nuclear · Italy · 1,009 MW · 3.9 km awayMontalto di Castro nuclear power plant 1 — Cancelled · Nuclear · Italy · 1,009 MW · 3.9 km awayGierre Tuscania solar farm -- — Announced · Solar · Italy · 31.9 MW · 6.9 km awayViterbo-2 (Kinesis-Ingenium) solar farm -- — Announced · Solar · Italy · 30.2 MW · 9.1 km awayViterbo (Kinesis-Ingenium) solar farm -- — Announced · Solar · Italy · 49.6 MW · 11.5 km awayGreenHill Valentano solar farm -- — Announced · Solar · Italy · 30.5 MW · 13.5 km awayVetralla solar farm -- — Announced · Solar · Italy · 24.5 MW · 15.1 km awayAgriCastro solar farm -- — Announced · Solar · Italy · 25.6 MW · 16.7 km away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

EDP Renewables

Follow this company

Power plant owner

Key facts

Power plant owner · 82 MW
Assets
2
Projects
1
Headquarters
Madrid, Spain Source: Wikidata
Listed
OTC Markets Group: EDRVF Source: Wikidata
LEI
529900MUFAH07Q1TAX06 Source: Wikidata
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Assets 2

Assets

2

Capacity

82.0 MW

MW by fuel
  1. Solar: 82.0 MW, 2 assets

Owns 2 power plants

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 8

within 25 km

Projects

8

within 25 km

Nearest

3.9 km

Montalto di Castro nuclear power plant 2

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Cancelled Montalto di Castro nuclear power plant 2 Nuclear 1,009 MW 3.9 km away nearest: Castrum 13 solar farm
Cancelled Montalto di Castro nuclear power plant 1 Nuclear 1,009 MW 3.9 km away nearest: Castrum 13 solar farm
Announced Gierre Tuscania solar farm -- Solar 31.9 MW 6.9 km away nearest: Tuscia 21 solar farm
Announced Viterbo-2 (Kinesis-Ingenium) solar farm -- Solar 30.2 MW 9.1 km away nearest: Tuscia 21 solar farm
Announced Viterbo (Kinesis-Ingenium) solar farm -- Solar 49.6 MW 11.5 km away nearest: Tuscia 21 solar farm
Announced GreenHill Valentano solar farm -- Solar 30.5 MW 13.5 km away nearest: Tuscia 21 solar farm
Announced Vetralla solar farm -- Solar 24.5 MW 15.1 km away nearest: Tuscia 21 solar farm
Announced AgriCastro solar farm -- Solar 25.6 MW 16.7 km away nearest: Tuscia 21 solar farm

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution