Lake Marion — Power plant · Oil · Energy Alternatives Wholesale LLCHastings — Power plant · Oil · Energy Alternatives Wholesale LLCGladiolus Solar, LLC — Postponed · Solar · MN · 1 MW · 6.6 mi awayJIMNIST LLC — Built · Large load · MN · 8.3 mi awayDakota Solar — Postponed · Solar · MN · 3 MW · 11.0 mi awayMazaska Garden — Under construction · Solar · MN · 5 MW · 11.1 mi awayHydra Community Solar — Postponed · Solar · MN · 1 MW · 12.7 mi awayEAGAN 5 MW DATA CENTER — Built · Large load · MN · 13.8 mi awayBlue Lake BESS — Under construction · Storage · MN · 135.5 MW · 14.4 mi awayBlack Dog — Postponed · Gas, combined cycle · MN · 760 MW · 14.7 mi away
  • Combustion
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Energy Alternatives Wholesale LLC

Follow this company

Power plant owner

Key facts

Power plant owner · 17.6 MW
Assets
2
States
MN
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Gross output of plants with a stake

2 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 2 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 2 plants recorded as wholly owned.2 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2012 to 2018
  • Oil
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearOilTotal (MWh)
2018 (part year)00
20173939
2016143143
2015222222
2014553553
2013285285
2012534534

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 2

Assets

2

Capacity

17.6 MW

MW by fuel
  1. Oil: 17.6 MW, 2 assets

Operates 2 power plants

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 8

within 15 mi

Projects

8

within 15 mi

Nearest

6.6 mi

Gladiolus Solar, LLC

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Gladiolus Solar, LLC Solar 1 MW 6.6 mi away nearest: Hastings
Built JIMNIST LLC Large load — 8.3 mi away nearest: Hastings
Postponed Dakota Solar Solar 3 MW 11.0 mi away nearest: Hastings
Under construction Mazaska Garden Solar 5 MW 11.1 mi away nearest: Lake Marion
Postponed Hydra Community Solar Solar 1 MW 12.7 mi away nearest: Lake Marion
Built EAGAN 5 MW DATA CENTER Large load — 13.8 mi away nearest: Hastings
Under construction Blue Lake BESS Storage 135.5 MW 14.4 mi away nearest: Lake Marion
Postponed Black Dog Gas, combined cycle 760 MW 14.7 mi away nearest: Lake Marion

Sources EIA-860M · EPA ICIS-Air

Sources

Every source and license · Attribution