Eunice LA Plant — Power plant · Gas, steam turbine · EnLink Processing Services, LLCENLINK PROCESSING SERVICES LLC, RIVERSIDE FRACTIONATION PLANT — Petroleum product terminalGeismar — Gas, combustion turbine · LA · 70 MW · 3.8 km awayMowata Solar — Solar · LA · 150 MW · 14.5 km awayCypress Harvest Solar Station — Solar + storage · LA · 400 MW · 22.0 km away
  • Combustion
  • Operating
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

EnLink Processing Services, LLC

Follow this company

Power plant owner and Petroleum product terminal owner

Key facts

Power plant owner and Petroleum product terminal owner · 4.7 MW
Assets
2
States
LA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,118 of 50,271 companies here. Why

Gross output of plants with a stake

1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.0% of the output is from 1 plant recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2024 to 2025
  • Gas
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasTotal (MWh)
2025-4,253-4,253
2024 (part year)-2,151-2,151

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 2

Assets

2

2 kinds

Capacity

4.7 MW

1 of 2 give MW

MW by fuel
  1. Gas, steam turbine: 4.7 MW, 1 asset

Operates 1 power plant · Owns 1 petroleum product terminal

Sources EIA-860M · EIA Energy Atlas

Sources

Every source and license · Attribution

Around this company

Nearby 3

within 25 km

Projects

3

within 25 km

Nearest

3.8 km

Geismar

All 3NearbyShowing all 3 nearby projects.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Geismar Gas, combustion turbine 70 MW 3.8 km away nearest: ENLINK PROCESSING SERVICES LLC, RIVERSIDE FRACTIONATION PLANT
Filed Mowata Solar Solar 150 MW 14.5 km away nearest: Eunice LA Plant
Announced Cypress Harvest Solar Station Solar + storage 400 MW 22.0 km away nearest: ENLINK PROCESSING SERVICES LLC, RIVERSIDE FRACTIONATION PLANT