Florida Southeast Connection — Gas pipeline · Florida Southeast ConnectionMartin — Postponed · Gas, combined cycle · FL · 1,754 MW · 0.4 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Florida Southeast Connection

Follow this company

Gas pipeline operator

Key facts

Gas pipeline operator · 119 miles
Pipeline and line held
119miles
Assets
1
States
FL
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why

Assets 1

Assets

1

Assets by type
  1. Gas pipeline: 1 assets, 1 asset

Operates 1 gas pipeline

Sources EIA Energy Atlas

Sources

Every source and license · Attribution

Around this company

Nearby 1

within 15 mi

Projects

1

of 7 before the technology filter

Nearest

0.4 mi

Martin

1 of 7 · gas-related technologiesNearbyShowing 1 of 7 nearby projects, narrowed to gas-related technologies because this company operates gas infrastructure. Show all 7

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Martin Gas, combined cycle 1,754 MW 0.4 mi away nearest: Florida Southeast Connection

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution